Pre-installation Adjustments
Installation of Attachments
For details on installing the attachment, please
refer to the separate attachment's Operating
Manual.
Installation of Universal Joint
Important
Check the alignment point of the splines
before installing (inserting) the universal joint.
Check the alignment point of the splines for
connecting the universal joint.
zobulo-017
Installation of Universal Joint_001
Align the holes of the universal joint and
gearbox, and then install it with the pin,
washer and cotter pin.
1
4 3
2
zobulo-018
Installation of Universal Joint_002
1
Universal joint
2
Pin
3
Washer
4
Cotter pin
Note:
For removing the universal joint, reverse the
installation procedure.
1.
2.
Inspections
Inspect the machine according to the
maintenance schedule so that you will be able to
take advantage of its optimum performance for a
long period of time.
Hood
Inspection of Hood (Intake)
Make sure that there is no damage to the
hood.
Make sure that the intake is not dirty.
Cleaning of Hood (Intake)
Important
An unclean hood intake may cause
overheating or damage to the engine.
It may also cause malfunction of the hydraulic
system.
Important
While cleaning, do not allow water to get on
the engine.
This may cause damage to the engine.
If the intake has been contaminated with dust,
be sure to clean it.
After operating the machine in a dusty
environment, it is important to remove dust as
soon as possible.
Open the hood.
Carefully clean the inside and outside of the
intake with water or compressed air.
1
2
5
4
3
3
s2vhhj-002
Cleaning of Hood (Intake)_001
1.
2.
1.
2.
GM1700
Handling Instructions
Page 4-2
Pre-installation Adjustments
Содержание GM1700
Страница 6: ...GM1700 Introduction...
Страница 8: ...GM1700 Contents...
Страница 14: ...GM1700 Safety Page 1 6 Safe Operating Practices...
Страница 58: ...GM1700 Handling Instructions Page 4 30 Storage...
Страница 82: ...GM1700 Maintenance Page 5 24 Maintenance Work...
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......