
Caution
Before starting pressure measurement, make
sure that there are no people around the
machine.
Caution
For the pressure gauge and hydraulic hose,
use devices capable of withstanding at least
30 MPa (306.43 kgf/cm
2
) (4,350.98 psi).
Note:
The reverse side measuring port elbow is
located on the front side of the brush frame in
the main body center area.
Remove the screw cap from the reverse
side measuring port elbow.
Prepare a pressure gauge for high pressure
measurements.
3
2
1
4
7edlvx-031
Reverse_002
1
Reverse side measuring port elbow
2
Screw cap
3
Brush frame
4
Pressure gauge for high pressure
measurements
Attach the pressure gauge for high
pressure measurements.
1.
2.
3.
Secure the pressure gauge for high
pressure measurements with a band or the
like.
2
1
g5t8is-029
Reverse_003
1
Pressure gauge for high pressure
measurements
2
Band
Caution
The sling position is not at the center.
Hold the handle firmly and measure the oil
pressure.
1
2
7edlvx-032
Reverse_004
1
Main body frame
2
Sling installation area
Use a sling etc. to apply resistance so that
the machine does not advance forward.
Start the engine, and rev it up to the
maximum rpm.
Press the reverse pedal. It is normal if the
pressure becomes 20.6 MPa (210.6 kgf/
cm
2
) (2.987 psi) with the tires not rotating.
4.
5.
6.
7.
Hydraulic system
FS900
Hydraulic system
Page 4-33
Measurement
Содержание FS900
Страница 1: ...Riding Sweeper Service Manual Serial No FS900 10001 Ver 1 0...
Страница 4: ...FS900 Contents...
Страница 10: ...FS900 Safety Page 1 6 Safety Signs and Instruction Signs...
Страница 11: ...Waste Disposal Page 2 2 About the Waste disposal Page 2 2 Disposal FS900 Disposal Page 2 1...
Страница 28: ...FS900 Maintenance standards and maintenance Page 3 16 Greasing...
Страница 74: ...FS900 Hydraulic system Page 4 46 Inspection and repair of each section...
Страница 98: ...FS900 Electrical system Page 5 24 General inspection and repair...
Страница 118: ...FS900 Main body Page 6 20 Inspection and repair of each section...
Страница 163: ...Head Office 1 26 Miyuki cho Toyokawa Aichi Pref 442 8530 Japan Tel 0533 84 1390 Fax 0533 89 3623 FS900 SM 00Z 17A 00 S K...