
Remove the lower brush frame link pipe on
the opposite side in the same way.
1
3
2
4 5
6
4
5
6
47n2pv-004
Installing the Operating Section_004
1
Operating section
2
Lower brush frame link pipe
3
Shaft
4
Bolt
5
Spring washer
6
Washer
Remove the bolt, spring washer, and
washer from only the front section of the
upper brush frame link pipe.
Follow the same steps to remove them from
the other side.
Remove the shaft from only the front
section of the upper brush frame link pipe.
Follow the same steps to remove it from the
other side.
1
3
2
4 5
6
4
5
6
47n2pv-006
Installing the Operating Section_005
1
Operating section
2
Upper brush frame link pipe.
3
Shaft
4
Bolt
5
Spring washer
6
Washer
10.
11.
12.
13.
14.
Caution
Removing the operating section is a two-
person job. Be sure to firmly support the
operating section.
Remove the operating section slowly and
surely toward the rear.
47n2pv-005
Installing the Operating Section_006
Installing the Working Section
Caution
The working section is heavy. Be sure to use
a hoist or a chain block.
Caution
Refer to the Tightening Torque Table.
Note that the Baroness product warranty may
not apply to defects caused by incorrect or
overtorque tightening, etc.
Important
When installing the brush frame linking pipe,
apply grease to moving parts. After
installation, apply additional grease.
For installation, reverse the removing
procedure.
15.
FS900
Operating Machine and Mower Units
Page 7-16
Removal and installation of each section
Содержание FS900
Страница 1: ...Riding Sweeper Service Manual Serial No FS900 10001 Ver 1 0...
Страница 4: ...FS900 Contents...
Страница 10: ...FS900 Safety Page 1 6 Safety Signs and Instruction Signs...
Страница 11: ...Waste Disposal Page 2 2 About the Waste disposal Page 2 2 Disposal FS900 Disposal Page 2 1...
Страница 28: ...FS900 Maintenance standards and maintenance Page 3 16 Greasing...
Страница 74: ...FS900 Hydraulic system Page 4 46 Inspection and repair of each section...
Страница 98: ...FS900 Electrical system Page 5 24 General inspection and repair...
Страница 118: ...FS900 Main body Page 6 20 Inspection and repair of each section...
Страница 163: ...Head Office 1 26 Miyuki cho Toyokawa Aichi Pref 442 8530 Japan Tel 0533 84 1390 Fax 0533 89 3623 FS900 SM 00Z 17A 00 S K...