25
KEYWAY STUDS
(ONTO WHICH THE CHAMBER’S REAR
COVER PANEL KEYHOLE SLOTS WILL FIT)
TOP PLENUM, DOWN VIEW:
REAR
KEYHOLE SLOTS
(ONE IN EACH CORNER)
FAN VENTS
SPACERS STUDS
(
ASSURE THAT CIRCULATION FAN BLADES
DO NOT STRIKE THE PLENUM)
FRONT
1.
Open the outer and inner front chamber doors. Hold the top plenum
with the spacer studs up and the keyway studs toward the rear. Tilt
the panel at an angle and carefully move it into the chamber while
lifting and centering it at the top of the chamber. Insert the larger
keyhole slots located at the plenum’s corners over the four studs
suspended from the chamber ceiling. Slide the top plenum toward
the rear of the chamber locking the plenum into place on the studs.
INSTALLATION:
(Con’t)
SHELVING AND PLENUM INSTALLATION: (Con’t)
SHELF SUPPORT SIDE PANELS (2), HEAD ON VIEW:
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com