12
F-4.4) Conduit Box and Cable Assembly:
Refi ll with cooling oil as outlined in paragraph F-1.3. Position
conduit box (49) and square ring (21) over opening, apply
thread locking compound (38) to cap screws (23) threads and
torque to 16 ft. lb. Remove gland nuts (49B) and (49F), friction
rings (49C) and (49G), and grommets (49D) and (49H) from
conduit box (49) inspect and replace if required.(See Figure
9). Insert one friction ring (49C), grommet (49D), one friction
ring (49C) and gland nut (49B) into conduit box for power cable
(49A). For control cable (49E), insert grommet (49H), friction
ring (49G) and gland nut (49F). Torque gland nuts (49B) and
(49F) to 15 ft. lb. to prevent water leakage.
F-5) Base & Elbow Service:
To clean out base elbow (55) remove cap screws, clean-out
plates and gaskets from elbow (55). Inspect gaskets and re-
place if damaged. If gasket (59) is damaged or leaking, remove
hex nuts (58) and lockwashers (57) and lift pump assembly
from base elbow (55). To replace gasket (54) on 4DSE-L pump
models, disassemble volute as outlined in paragraph F-2.1.
Then remove screws (52) and adapter (53).
Reassemble by placing gasket (54) and adapter (53) on volute
(43) with screws (52). Reassemble volute onto pump assembly
as outlined in paragraph F-2.2. Place gasket (59) onto base
elbow (55). Assemble lockwashers (57) and hex nuts (58) onto
studs (56) and tighten evenly. To replace gasket (54) on
4DSE-HL pump models, remove pump from elbow as outlined
above. Remove screws (52) and adapter (53). Reassemble by
placing gasket (54) and adapter (53) on volute (43) with screws
(52). Place gasket (59) onto base elbow (55). Assemble
lockwashers (57) and hex nuts (58) onto studs (56) and tighten
evenly.
SINGLE PHASE 240 VOLT AC
SINGLE PHASE 240 VOLT AC
Power Cable
Power Cable
Motor Lead Number
Motor Lead Number
Green (Ground)
Green
Black
1
Red
2
White
3
THREE PHASE 200-240 VOLT AC
THREE PHASE 200-240 VOLT AC
Power Cable
Power Cable
Motor Lead Number
Motor Lead Number
Green (Ground)
Green
Black
1 & 7
Red
2 & 8
White
3 & 9
T4, T5 & T6 Together
FIGURE 8
(49J)
(22) & (36)
(32)
Gland Nut (49B)
Power Cable (49A)
Friction Ring
(49C)
Grommet
(49D)
Friction
Ring
(49C)
Conduit Box
& Cable
Assembly
(49)
Friction Ring
(49G)
Grommet
(49H)
Friction
Ring
(49G)
Gland Nut (49F)
Control
Cable
(49E)
FIGURE 9
Содержание BARNES 4DSE-HL Series
Страница 15: ...15 FIGURE 10 4DSE L Pump Series...
Страница 16: ...16 FIGURE 11 4DSE L Pump Series...
Страница 17: ...17 4DSE L Pump Series FIGURE 12...
Страница 21: ...21 4DSE HL High Ef ciency Pump Series FIGURE 13...
Страница 22: ...22 4DSE HL High Ef ciency Pump Series FIGURE 14...
Страница 23: ...23 4DSE HL High Ef ciency Pump Series FIGURE 15...
Страница 27: ...27 NOTE...