Manual 2100-348
Page 11
FIGURE 6
WALL MOUNTING INSTRUCTIONS
FIGURE 7
WALL MOUNTING INSTRUCTIONS
MIS-548
MIS-549
SEE FIGURE 3 – MOUNTING INSTRUCTIONS
SUPPLY AIR
OPENING
RETURN AIR
OPENING
RETURN AIR
OPENING
SUPPLY AIR
OPENING
BOTTOM MOUNTING
BRACKET. MOUNT ON WALL
BEFORE INSTALLING UNIT.
RETURN AIR
OPENING
SUPPLY AIR
OPENING
WALL STRUCTURE
FACTORY SUPPLIED RAIN
FLASHING. MOUNT ON UNIT
BEFORE INSTALLATION
SEE UNIT DIMENSIONS, FIGURE
1, FOR ACTUAL DIMENSIONS
ATTACH TO TOP
PLATE OF WALL
1.000” CLEARANCE
ALL AROUND
INTERIOR FINISHED WALL
OVER FRAME
1.000” CLEARANCE
ALL AROUND
EXTERIOR FINISHED WALL
OVER FRAME
ATTACH TO BOTTOM
PLATE OF WALL
FRAMING MATERIAL
2 X 4’S, 2 X 6’S AND/OR
STRUCTURAL STEEL
THIS STRUCTURAL MEMBER LOCATED TO MATCH
STUD SPACING FOR REST OF WALL. A SECOND
MEMBER MAY BE REQUIRED FOR SOME WALLS.
RETURN DUCT
OPENING
SUPPLY DUCT
OPENING
Содержание WA4822
Страница 5: ...Manual 2100 348 Page 3 FIGURE 1 UNIT DIMENSIONS WA602N WA6023 WA4823 ONLY MIS 1348 ...
Страница 6: ...Manual 2100 348 Page 4 FIGURE 2 UNIT DIMENSIONS WA6022 WA4822 ONLY MIS 1442 ...
Страница 10: ...Manual 2100 348 Page 8 FIGURE 3 MOUNTING INSTRUCTIONS WA602N WA6023 WA4823 ONLY MIS 1349 ...
Страница 11: ...Manual 2100 348 Page 9 FIGURE 4 MOUNTING INSTRUCTIONS WA6022 WA4822 ONLY MIS 1444 ...
Страница 16: ...Manual 2100 348 Page 14 FIGURE 9 UNIT 24V TERMINAL BOARD MIS 1373A ...