Bard Site-Rite 5 Скачать руководство пользователя страница 31

­8

Site~Rite*­5

 Ultrasound System

6­­Installing­Software

The Site~Rite* 5 Ultrasound System allows software installation through the USB connectors located on the 
rear of the scanner.

To­install­software:

1.   Press the Freeze button (       ) to pause the system.

2.   Insert a USB drive into one of the USB connectors located on the rear of the Site~Rite 5 scanner. 

3.   Wait until the storage device icon is illuminated before proceeding.

4.   Simultaneously press and hold the Gain buttons (        ) until the configuration screen appears.

5.   When the configuration screen appears, simultaneously press and hold the Depth button ( 

cm

 ) and  

 

Depth Marker button (

 

/:\

 ) until the software installation process begins.

 

Note:  

The Site~Rite 5 System will automatically upload the software from the attached USB drive. 

 

Note:  

The screen will appear blank and/or inactive during the software installation process. 

6.   When a blinking cursor appears, power off the Site~Rite 5 scanner.

7.   Disconnect the USB drive.

8.   Power on the Site~Rite 5 scanner.

9.   Verify that the correct software version appears on the upper left hand corner of the screen.

10. Resume normal operation. 

Содержание Site-Rite 5

Страница 1: ...date May 2006 Bard and Site Rite are trademarks and or registered trademarks of C R Bard Inc or an affiliate Cidex is a registered trademark of Johnson and Johnson Medical Inc U S Patent 5 235 987 U S...

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ...e BF Type Equipment AC Adapter Dot Markers Active Dangerous Voltage Power Stand by Warning Refer to Manual Before Use Medical Electrical Equipment Classified by ETL with respect to Electric Shock Fire...

Страница 6: ...C 35o C Storage Temperature Parameters Fragile Prescription Only Battery Pack Freeze Image Gain Depth In Centimeters cm 15o C 38o C Operating Temperature Parameters Ultrasound Probe Do not dispose wit...

Страница 7: ...r to Approved Roll Stands 2 4 Adjusting the Scanner 2 5 Attaching the Power Source and Charging the Battery 2 6 Connecting and Disconnecting Site Rite 5 Probes 2 7 Powering on the Site Rite 5 Ultrasou...

Страница 8: ...lling Software 7 Calibrating the Internal Battery 8 Warranty 9 Technical Specifications 9 1 Operating and Storage Conditions 9 2 Scanner Specifications 9 3 Probe Acoustic Output Specifications 9 4 Pro...

Страница 9: ...Solution Discontinue use immediately Return to authorized repair facility Cause Display malfunction Solution Most display malfunctions can easily be corrected by resetting the system To do so power of...

Страница 10: ...by Bard Access Systems authorized service personnel Opening or servicing the battery pack or the combination A C adapter and battery charger by anyone other than Bard Access Systems authorized service...

Страница 11: ...to enter the scanner combination A C adapter and battery charger probe connector or probe port Damage to equipment may occur Warning Do not attempt to sterilize the Site Rite 5 scanner or probes with...

Страница 12: ...ound System and Components The Site Rite 5 Ultrasound System is an easy to use and portable ultrasound scanner Site Rite 5 Ultrasound System and Accessories include Site Rite 5 scanner Site Rite vascu...

Страница 13: ...evice to charge Site Rite 5 battery packs may damage the battery packs and will void your warranty Warning Only connect a Site Rite 5 combination A C adapter and battery charger to the Site Rite 5 Sys...

Страница 14: ...dapter and battery charger by anyone other than Bard Access Systems authorized service personnel Connecting the Site Rite 5 scanner to any power source other than the Site Rite 5 combination A C adapt...

Страница 15: ...ell below all FDA thresholds for adverse biological effects any given Ultrasound Procedure should be performed using the principle of ALARA As Low As Reasonably Achievable The licensed medical practit...

Страница 16: ...contain latex Caution Do not force the probe connector Damage to the connector and system could result Caution Always snap the needle guides on to the probe hook Do not slide the needle guide on to t...

Страница 17: ...oted do not use the probe Damage to the system may occur Caution Hot water in excess of 113o F or 45o C may damage the probe Caution Use only Bard Access Systems cleaning and disinfection procedures F...

Страница 18: ...inst the packing slip Inspect all parts for damage If any damage is found please contact Bard Access Systems at 800 443 3385 2 1 Roll Stand Options Collapsible Roll Stand Standard Roll Stand VAD Bedsi...

Страница 19: ...r to probe arm as shown Step 2 Attach Probe Arm to monitor mounting plate using rear two holes only as shown Step 4 Using two screws removed in Step 3 mount Monitor Plate and Probe Arm assembly to Swi...

Страница 20: ...unting plate assembly as shown Step 6 Start two screws in the top two monitor mounting locations as shown Step 7 Slide monitor onto monitor mounting plate insert two screws in lower mounting locations...

Страница 21: ...mm VESA Mount Warning Do not overtighten screws when attaching to the VESA roll stand mount Doing so may damage the scanner Warning Use only screws provided in packaging Ensure the unit is secure agai...

Страница 22: ...5 Use of any other device to charge Site Rite 5 battery packs may damage the battery packs and will void your warranty Warning Only connect a Site Rite 5 combination A C adapter and battery charger t...

Страница 23: ...System depress and release the power button again The system is powered off when the display screen darkens Probe Connected USB Connected Device Warning Use only Bard Access Systems probes with this s...

Страница 24: ...e In Time Set mode this button selects the next field Depth Markers Toggles depth markers on off Print Sends the current image to the printer if connected If a USB storage device is connected to the s...

Страница 25: ...is in freeze mode the indicator is shown in red and blinks briefly every second Depth Marker Indicator When depth markers are enabled the indicator is highlighted in light green Storage Device Indicat...

Страница 26: ...d is shown as a dark gray outline when disconnected Battery Indicator The 5 charge levels for the batteries are displayed as shown When the unit is recharging the indicator is green for all 5 levels W...

Страница 27: ...mp on the left side of the probe This bump corresponds to the probe orienta tion mark located on the Site Rite 5 display screen When using the Site Rite 5 probe hold the probe so that the side with th...

Страница 28: ...rs and needle guide kits that do not contain latex To purchase sterile plastic probe covers contact Bard Access Systems Customer Service at Customer Service 800 545 0890 www bardaccess com To drape th...

Страница 29: ...dle while looking at the screen of the Site Rite 5 scanner When the needle approaches the target vessel you should see the anterior wall indenting Once puncture occurs the vessel returns to normal sha...

Страница 30: ...setting the date and time press the Depth button cm to enter the image size fields The current image size will be highlighted 6 Press the Gain buttons to select the desired image size 7 Press the Free...

Страница 31: ...Gain buttons until the configuration screen appears 5 When the configuration screen appears simultaneously press and hold the Depth button cm and Depth Marker button until the software installation p...

Страница 32: ...r until the system powers off 3 Connect the Site Rite 5 scanner to the Site Rite 5 combination A C adapter and battery charger to recharge the internal battery Note At least six hours of charge time i...

Страница 33: ...ation of the Site Rite 5 System The following actions void the warranty of the Site Rite 5 System Opening or servicing the scanner or the probe housing Removal of system labels by anyone other than by...

Страница 34: ...AC adapter Internal and External DC Battery Pack Power Consumption 82 Watts Maximum Monitor Size 12 1 diagonal IEC 60601 1 Class II Type BF Applied Part Continuous Operation Internally Powered Equipme...

Страница 35: ...ffects may occur While the Site Rite 5 acoustic output parameters fall well below all FDA thresholds for adverse biological effects any given Ultrasound Procedure should be per formed using the princi...

Страница 36: ...6 Amps Combination A C Adapter Auxiliary Battery Specifications Input Voltage 100 240 VAC 50 60 Hz Input Current Max 1 Amp A C Adapter Output Voltage 15 VDC A C Adapter Output Current Max 7 Amps Nomi...

Страница 37: ...nts and Tests IEC 60601 2 37 2005 Medical Electrical Equipment Part 2 37 Particular Requirements for the Safety of Ultrasonic Medical Diagnostic and Monitoring Equipment NEMA UD 2 2004 Acoustic Output...

Страница 38: ...e expressed written consent of Bard Access Systems Site Rite 5 Ultrasound System Manufactured by Bard Access Systems Inc Salt Lake City UT 84116 U S A 801 595 0700 Customer Service 800 545 0890 Techni...

Страница 39: ......

Страница 40: ......

Отзывы: