Manual 2100-749
Page
58 of 68
Variable Speed Blower/Condenser Fan
Electrical shock hazard.
Live terminals and connections even when
device is turned off.
Wait 5 minutes after power has been removed
from unit before disconnecting the voltage to
the blower/fan motor as internal buss voltage
may still be present.
Failure to do so could result in electric shock
or death.
!
WARNING
Maintenance
CAUTION:
If control voltage or a stored speed value are
still applied during power reset, motor may
start automatically.
• Keep out of device danger zones.
• When working on/around the fan/blower, switch off
line voltage to the unit, ensuring that it cannot be
switched back on inadvertently, and wait 5 minutes
before removing terminal covers.
• Wait until fan/blower comes to a complete stop
before entering areas.
• After work is performed, verify all tools have been
removed from unit and specifically the rotational
area of the fan/blower.
FIGURE 80
Fan Terminals
Connector
Terminal
Description
CON1
L1
Line Power Phase 1
CON1
L2
Line Power Phase 2
CON1
L3
Line Power Phase 3
Housing
PE
Line Power Ground Terminal
CON2
RSA
CON2
RSB
Modbus -
CON2
GND
Control Ground Terminal
Housing
LED
Motor Status LED
Gen3 Motor Terminal Box
Gen2 Motor Terminal Box
8 9 10 11 12 13 14
DI
N 2
DI
N 3
G
ND
Ain 2U +20V Ain 2I Aout
PE
RS
A
RS
B
G
ND
Ain 1U +10V Ain 1I DI
N1
NO
CO
M
NC
PE
L1
L2
L3
1 2 3 4 5 6 7
1 2 3
1 2 3
KL3
KL2
KL1