Manual 2100-689H
Page
14 of 42
FIGURE 5
Wall Mounting Instructions
FIGURE 6
Wall Mounting Instructions
DUCT
OPENING
RETURN AIR
SUPPLY AIR
WOOD FRAME WALL INSTALLATION
OPENING
WALL BEFORE
MOUNT ON UNIT
OPENING
BEFORE INSTALLATION
BOTTOM MOUNTING
CONCRETE BLOCK WALL INSTALLATION
BRACKET. MOUNT ON
OPENING
WOOD OR STEEL SIDING
OPENING
INSTALLING UNIT.
RETURN AIR
WALL STRUCTURE
RETURN AIR
SUPPLY AIR
FACTORY SUPPLIED
RAIN FLASHING.
SUPPLY AIR
MIS-548 A
SIDE VIEW
I
A
C
K
E + 1.000
B
1.000
SUPPLY DUCT
OVER FRAME
INTERIOR FINISHED WALL
ALL AROUND DUCT
FRAMING MATERIAL
EXTERIOR FINISH WALL
OPENING
FOR ACTUAL DIMENSIONS.
2 x 4'S, 2 x 6'S &/OR
STRUCTURAL STEEL
ATTACH TO TOP
1.000" CLEARANCE
1.000" CLEARANCE
PLATE OF WALL
C
SEE UNIT DIMENSIONS, FIGURE 2,
OPENING
RETURN DUCT
2 x 6
ATTACH TO BOTTOM
OVER FRAME
PLATE OF WALL
L
THIS STRUCTURAL MEMBER
LOCATED TO MATCH STUD
SPACING FOR REST OF WALL.
A SECOND MEMBER MAY BE
REQUIRED FOR SOME WALLS.
MIS-549 B
ALL AROUND DUCT
See Figures 3A and 3B Mounting Instructions
Содержание 11EER WA W18AB-A
Страница 2: ......
Страница 24: ......
Страница 67: ......
Страница 71: ...Manual 2110 1449H Page 4 of 12 FUNCTIONAL COMPONENTS 10 11 2 3 1 4 5 6 9 8 7 12 13 14 15 SEXP 949...
Страница 75: ...Manual 2110 1449H Page 8 of 12 CONTROL PANEL 14 13 6 15 18 16 4 11 7 10 9 1 3 12 17 5 2 SEXP 908...
Страница 77: ...Manual 2110 1449H Page 10 of 12 CONTROL PANEL 7 17 11 12 16 3 10 8 13 15 14 9 4 5 6 18 1 2 SEXP 948...
Страница 80: ......
Страница 83: ......
Страница 97: ......