11. Electronics Unit
Image 11-14
Plugging in the cable connector
6. If the Secondary cooling unit has been installed, plug in the cable connector to the Secondary cooling unit.
Image 11-15
Plugging in the DMD cable connector
7. Connect the main pump motor wiring. See "Connecting the primary pump wiring", page 45.
8. Remove the compressor wiring connection cover (reference 2, image 11-16). In order to do so, remove the nut (reference 1)
from the compressor.
2
1
Image 11-16
Removing the nut and wiring cover from the compressor
9. Connect the compressor wiring.
R5906015 ULC-30A 01/02/2018
73
Содержание ULC-30A
Страница 1: ...ULC 30A Service manual R5906015 01 01 02 2018...
Страница 4: ......
Страница 6: ...Table of contents Index 97 2 R5906015 ULC 30A 01 02 2018...
Страница 10: ...1 Safety 6 R5906015 ULC 30A 01 02 2018...
Страница 23: ...5 Covers 1 1 1 2 2 2 2 2 2 2 2 2 2 2 Image 5 4 Installing the 14 screws R5906015 ULC 30A 01 02 2018 19...
Страница 24: ...5 Covers 20 R5906015 ULC 30A 01 02 2018...
Страница 28: ...6 Fan unit 24 R5906015 ULC 30A 01 02 2018...
Страница 40: ...7 Coolant procedures 36 R5906015 ULC 30A 01 02 2018...
Страница 70: ...10 Refrigeration unit 66 R5906015 ULC 30A 01 02 2018...
Страница 92: ...11 Electronics Unit 88 R5906015 ULC 30A 01 02 2018...
Страница 100: ...A Appendix 96 R5906015 ULC 30A 01 02 2018...