![background image](http://html1.mh-extra.com/html/barco/ulc-30a/ulc-30a_service-manual_3812456068.webp)
10. Refrigeration unit
Image 10-24
Plugging the 3 cable connectors
10.Connect the two open type quick couplers of the refrigeration Unit.
Note:
First remove the caps and plugs.
Warning:
Risk of serious liquid spillage: ensure that the clips are correctly & fully engaged after assembly. An audible click
can be heard when the connector is correctly inserted.
Image 10-25
Connecting the quick coupler
11.Insulate the refrigeration Unit quick couplers.
a) Apply contact glue to all mating surfaces of the insulation shells.
b) Allow the glue to dry for 20–40 minutes.
c) Install the insulation shells.
d) Make the insulation airtight using foam tape.
12.Install cable ties (reference 1 image 10-26) to secure the insulation to the refrigeration Unit quick couplers.
1
1
1
1
1
1
Image 10-26
Installing cable ties
64
R5906015 ULC-30A 01/02/2018
Содержание ULC-30A
Страница 1: ...ULC 30A Service manual R5906015 01 01 02 2018...
Страница 4: ......
Страница 6: ...Table of contents Index 97 2 R5906015 ULC 30A 01 02 2018...
Страница 10: ...1 Safety 6 R5906015 ULC 30A 01 02 2018...
Страница 23: ...5 Covers 1 1 1 2 2 2 2 2 2 2 2 2 2 2 Image 5 4 Installing the 14 screws R5906015 ULC 30A 01 02 2018 19...
Страница 24: ...5 Covers 20 R5906015 ULC 30A 01 02 2018...
Страница 28: ...6 Fan unit 24 R5906015 ULC 30A 01 02 2018...
Страница 40: ...7 Coolant procedures 36 R5906015 ULC 30A 01 02 2018...
Страница 70: ...10 Refrigeration unit 66 R5906015 ULC 30A 01 02 2018...
Страница 92: ...11 Electronics Unit 88 R5906015 ULC 30A 01 02 2018...
Страница 100: ...A Appendix 96 R5906015 ULC 30A 01 02 2018...