Battery Back Up Installation
Battery Back Up (optional)
The opener has provision for a Battery Back Up kit
that allows continued operation of the door in the
absence of mains power.
Installation
1. Disconnect power to the opener.
2. Remove screws and swing open the cover
(Fig
48).
3. Mount the PCB support with two screws item #
12. Secure the SBC0-2 Charger Board onto the
PCB support with three (3) screws item #14.
4. Feed the 2-wire battery harness item # 5 through
the grommet on the base plate and connect to
SBCO-2 battery charger board.
5. Feed charger harness from SBCO-2 battery
charger board to the control board and plug onto
the 5 pin connector marked “SBCO-2” on the
control board.
6. Mount Battery Backup and secure with item 11
and 13.
Warning: After the next step the opener
may become active (even when power
is off) due to a residual charge in the
batteries.
7. Connect item 5 and 10 together
(Fig 48).
8. Reconnect power.
Testing Battery Back Up
1. Press either the OPERATE button or transmitter
to activate the opener.
2. Whilst the door is in motion disconnect mains
power - the opener should continue to operate.
Note: Wait for the door to complete its
travel before proceeding to the next step
3. Press either the OPERATE button or transmitter
to activate the opener.
4. Whilst the door is in motion re-connect power.
The door should complete the cycle as normal.
Troubleshooting
If door stops or moves very slowly under battery power,
then the batteries may have little to no charge.
To remedy this connect mains power and leave the
batteries to charge. The batteries may take 24 to 48
hours to reach their maximum charge capacity.
Fig. 48
Controll-A-Door
®
P
Diamond SDO-2v2
Instruction Manual
26
Содержание Controll-A-Door P Diamond SDO-2v2
Страница 37: ......