34
User Manual
IT8000
3/8” Tie
-Lok® Data Tool
Document #P80080 Rev. B
© Copyright
BAND-IT-IDEX, Inc. 2022
All rights reserved
All rights reserved
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
Graph Screen
The graph screen shows several inputs over the course of a tie install. Velocity and Torque are the motor
readings. Pressure is the punch pressure inside the tool. It also has two vertical lines where the Punch and Cut
happen. All data shown on the graph screen is stored in the PLC. When switching to the graph screen the HMI
will auto populate with the most recent cycle. When on the graph screen “
Refresh
” must be pressed. Graph
populating takes around 1 minutes. There is a green status bar below the “Reset
Error” button that shows
graphing progress.
Punch Time History
Punch time history can be seen under the graph
tab, by clicking on
TABLE.
The table shows the
punch time for the last 30 clamps. It automatically
updates with the latest clamp at the top. To
return to the graph screen, press the “graph”
button.
Figure 58
Figure 59