PREPARATION FOR CONNECTING THE TRAIN TURNED
UPWARD
If you wish to orient the entrance train side upward before applying
the burner to the boiler, proceed as follows.
•
Following the instructions detailed in the “Maintenance” para
-
graph, extract the mixer assembly and remove the screw (8)
which connects the unit’s forward movement rod (14) to the gas
delivery pipe (15).Remove the screw (16) which connects the
gas mixer (17) to the pipe.
•
Turn the bend coupling through 180° (18) and the mixer (17),
in such a way that the inlet gas is turned upwards.Fix again the
mixer and the unit’s forward movement rod to the gas delivery
pipe.
•
Now remove the 4 nuts (19), disassemble the flame pipe (20)
from the relative stud bolts, reposition them with the threaded
connection for fixing the gas train upwards.
•
To complete the operation fix the flame pipe to the burner scroll
and finally reposition the mixing unit in the relative housing.
At this point it is possible to install the burner in the boiler with the
valve train as shown in configuration 9 illustrated in the paragraph
"Gas train assembly".
16
17
0002936600
15
14
18
8
19
20
0002936610
13 / 34
0006081532_202305
ENGLISH
Содержание TBG 45 ME
Страница 2: ......
Страница 32: ...SCHEMI ELETTRICI 30 34 0006081532_202305 ITALIANO...
Страница 33: ...31 34 0006081532_202305 ITALIANO...
Страница 34: ...32 34 0006081532_202305 ITALIANO...
Страница 36: ...34 34 0006081532_202305 ITALIANO...
Страница 66: ...WIRING DIAGRAMS 30 34 0006081532_202305 ENGLISH...
Страница 67: ...31 34 0006081532_202305 ENGLISH...
Страница 68: ...32 34 0006081532_202305 ENGLISH...
Страница 70: ...34 34 0006081532_202305 ENGLISH...
Страница 71: ......