OPERATOR
’S MANUAL
with Maintenance Information
Maintenance
53
5 Choose a point on the machine; i.e.,
contact patch of a tire, as a visual
reference for use when crossing the start
and finish lines.
6 Bring the machine to top drive speed
before reaching the start line. Begin timing
when your reference point on the machine
crosses the start line.
7 Continue at full speed and note the time
when your reference point on the machine
passes over the finish line. The time is less
than 25 sec.
B-11
Perform Hydraulic Oil Analysis
BALLYMORE/ DINGLI requires that this
procedure be performed every 250 hours or
quarterly, whichever comes first.
Replacement or testing of the hydraulic oil is
essential for good machine performance and
service life. Dirty oil may cause the machine to
perform poorly and continued use may cause
component damage. Extremely dirty
conditions may require oil changes to be
performed more often.
Before replacing the hydraulic oil, the oil may
be tested by an oil distributor for specific levels
of contamination to verify that changing the oil
is necessary.
If the hydraulic oil is not replaced at the two
year inspection, test the oil quarterly. Replace
the oil when it fails the test. See E-1, Test or
Replace the Hydraulic Oil.
Содержание SM0114113
Страница 3: ......
Страница 5: ......
Страница 17: ...OPERATOR S MANUAL with Maintenance Information Decals 12...