EVACUATION PROCEDURES
Connect the refrigerant pipes (both the liquid and gas
pipes) between the indoor and the outdoor units.
Remove the service port cap of the stop valve on th e sid e o f the
outdoor unit gas pipe. (Th e sto p valv e wi ll no
t wor k in i ts initial
state fresh out of the factory (totally closed with cap on).
Connect the gage manifold valve and the vacuum pump to the service port o f the stop valve on
th e ga s pipe
side of the outdoor unit.
Run the vacuum pump for more than 15 minutes and at this time confirm that the pressure gage indicates
-0.1 Mpa (-76 cmHg).
Check the vacuum with the gage manifold valve, then close the gage manifold valve, and
stop
the
vacuum pump.
Leave it as is for one or two minutes .Make sure the pointer of the gage manifold valve remains in the.
same position.
Close
Open
Hexagonal
wrench
Stop valve
pipe
Connection
Gage manifold valve
Stop valve
Liquid pipe
Stop valve
Hexagonal
wrench
Gas pipe
Caps
Service port
Vacuum pump
Remove the gage manifold valve qu ickly from the ser vice por t of the stop valve.
After refrigerant pipes are connected and evacuated, fully open all stop valves
on gas and liquid pipe sides.
Operating without fully opening lowers the performance and causes trouble.
Pipe length
exceeding 7m
Charge the prescribed
amount of gas.
Tighten the cap to the service port to obtain the initial status.
Retighten the cap.
Leak test
5.REFRIGERANT SYSTEM DIAGRAM
27
Pipelength
7mmaximum
Nogaschargeis
needed.
Содержание KF-25GWE
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 53: ...12 PARTS LIST KFR 33GE 52 KF R 25GE KFR 2501GE KFR 3301GE KF 34GE KFR 3201GE...
Страница 54: ...12 PARTS LIST KFR 33WE KF R 25WE KFR 2501WE KFR 3301WE KF 34WE KFR 3201WE 53...
Страница 55: ...12 PARTS LIST KF 5002WE 54...
Страница 62: ...12 PARTS LIST KF 4801WE 2 3 4 5 6 7 14 15 17 18 16 1 8 9 10 11 20 12 21 13 19 22 23 24 25 26 61...