- 32 -
B )●Thermostat:
1
、
normal starting up time is 4-8 hours
2
、
SPA Thermostat cannot be heated by man in the air, or there will be danger. If there is something wrong
in operation, professional servant is indeed needed to prevent the risk of electricity.
C )●Air pump:
Normal starting up time is 15-30 minutes
Please notice that water level should not be 7cm over the tub water level to prevent air pump being burnout
by water leakage.
D )●Paper element filters daily maintenance:
Type one:
1) Remove the outer cover of the skimmer
2) Pull out the skimmer screw;
3) Take out the paper core;
4) Wash the paper core with water, reset it after cleaning and dry out;
Type two:
1). Pull apart the crystal package of the paper core;
2). Pull out the cover of filtration bucket;
3). Match the paper core inside and screw it tight, then put the cover of filtration bucket back.
Type three:
Remove the lock nut according to the picture show
direction
Remove the cover on the filter box, put the
filter paper in
, then screw the cover and
lock nut.
Type four:
1) Remove the cover on the filter, and screw the core paper filter out.
Содержание BP6013G1
Страница 1: ...EN SPAS Installation and Directions of Use...
Страница 18: ...17 Utilities...
Страница 24: ...23 14 System Related Messages This message can be reset from the topside panel with any button press...
Страница 28: ...27...