OUTDOOR GAS CHARBROILER OPERATION MANUAL
3
INSTALLATION INSTRUCTIONS
Unpacking Instructions:
Carefully unpack the broiler and inspect immediately for
shipping damages. Your outdoor boiler was shipped in a
carton designed to give maximum protection in normal
handling. It was thoroughly inspected before leaving the
factory and the carrier accepted and signed for it. File
any claims for shipping damage or irregularities with the
carrier.
Assembly:
(Refer To Figure “A”)
These unassembled parts should be included in your
charbroiler package:
1 Grate (s)
3 Frame assembly 5 Water Pan (s) 7 Leg & Caster
Assemblies
2 Radiants 4 Carryover tube
cover (s)
6 Base
1. Remove shipping bands from carton.
2. Remove top of carton.
3. Remove grates from the unit and set them aside.
4. Remove and unwrap any small parts packages
that are located underneath the grates. If
stainless steel parts are coated with PVC film,
remove it prior to installation.
5. Lift frame assembly from carton and set aside.
6. Lift base from carton and place it upside down on
ground.
7. Install legs & caster assemblies and flip the stand
over into the upright position.
8. Mount side tank brackets to the unit (see Figures
A-1 & A-2).
9. Place the broiler on the stand.
10. Place the carryover tubes cover(s) on their
brackets to cover the tubes.
11. Place the radiants on their front and rear support
pins over each burner.
12. Place grates into frame assembly.
Figure A