background image

OUTDOOR GAS CHARBROILER OPERATION MANUAL

3

INSTALLATION INSTRUCTIONS

Unpacking Instructions:

Carefully unpack the broiler and inspect immediately for 
shipping damages. Your outdoor boiler was shipped in a 
carton designed to give maximum protection in normal 
handling. It was thoroughly inspected before leaving the 
factory and the carrier accepted and signed for it. File 
any claims for shipping damage or irregularities with the 
carrier.

Assembly: 

(Refer To Figure “A”)

These unassembled parts should be included in your 
charbroiler package:

1 Grate (s)

3 Frame assembly 5 Water Pan (s) 7 Leg & Caster 

Assemblies

2 Radiants 4 Carryover tube 

cover (s)

6 Base

1.  Remove shipping bands from carton.
2.  Remove top of carton.
3.  Remove grates from the unit and set them aside.
4.  Remove and unwrap any small parts packages 

that are located underneath the grates. If 
stainless steel parts are coated with PVC film, 
remove it prior to installation.

5.  Lift frame assembly from carton and set aside.
6.  Lift base from carton and place it upside down on 

ground.

7.  Install legs & caster assemblies and flip the stand 

over into the upright position.

8.  Mount side tank brackets to the unit (see Figures 

A-1 & A-2).

9.  Place the broiler on the stand.
10. Place the carryover tubes cover(s) on their 

brackets to cover the tubes.

11. Place the radiants on their front and rear support 

pins over each burner.

12. Place grates into frame assembly.

Figure A

Содержание CBBQ Series

Страница 1: ...BUILT BY CRAFTSMEN TESTED BY TIME SERIES CBBQ OPERATION MANUAL ULTIMATE SERIES OUTDOOR CHARBROILERS...

Страница 2: ...rs or liquids in the vicinity of this or any other appliance WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or death Read the installation...

Страница 3: ...EXPLODED VIEWS PARTS LISTS 10 WARRANTY 13 Gas Specifications Model Number Propane Gas BTU HR 10 W C Natural Gas BTU HR 3 5 W C CBBQ 60S 160 000 160 000 CBBQ 30S 80 000 80 000 Model Definitions Model...

Страница 4: ...esting of pipelines in excess of psig 3 45 kPa and isolated by turning off gas shut off valve during any testing less than psig 9 Inspect the flexible gas hose s prior to each use If excessive abrasio...

Страница 5: ...s 2 Radiants 4 Carryover tube cover s 6 Base 1 Remove shipping bands from carton 2 Remove top of carton 3 Remove grates from the unit and set them aside 4 Remove and unwrap any small parts packages th...

Страница 6: ...ill not allow gas to flow until a positive seal has been made See Figure A 3 Make sure the vent on the regulator is facing down toward the ground so that water and other liquids do not get into the re...

Страница 7: ...addy If your unit is equipped with optional tank caddy it has to be placed underneath the broiler and secured in place by 2 hooks provided see fig A 3 The front of the caddy will be raised off the gro...

Страница 8: ...ire crossover tube is lit by looking through the lighter hole s located on the front panel If the carryover tube s will not light or stay lit shut off the gas supply and do not use the unit Wait 5 min...

Страница 9: ...iff bristle brush or plastic pad Do not use chlorine bleach or other caustic chemicals Be careful not to get water into the burners or carryover tubes Do not pressure wash Water Pans Stand Clean like...

Страница 10: ...re gets below 70 deg F the ability to produce the vapor needed to burn decreases The lower the temperature the lower the performance of the grill because of less vapor available At temperatures below...

Страница 11: ...crews provided 4 Place broiler on stand Note that mounting screws for hoods wind guards and shelves are provided and must be removed from outer flange and used to mount accessories 5 Remove top grate...

Страница 12: ...OUTDOOR GAS CHARBROILER OPERATION MANUAL 10 EXPLODED VIEWS PARTS LISTS Exploded View CBBQ 30S CBBQ 60S Exterior Interior...

Страница 13: ...BBQ30 29 T1239A Richlite Deck CBBQ60 30 G6043U Tank Side Bracket Assy 20 Cylinder 31 R1137A Cylinder 20 LP 32 G6045T Tank Caddy Assy Single 40 Cylinder 33 G6044T Tank Caddy Assy Double 40 Cylinder 34...

Страница 14: ...fice 60 Nat Pilot 68 R3197P Orifice 53 L P Burner 69 R3198P Orifice 74 L P Pilot 70 R1141P Manifold Assy Right CBBQ30 Nat only Item P N Description 71 R3194A Carry over Tube Left 72 R3195A Carry over...

Страница 15: ...ants Stones and Valves are covered for a period of SIX MONTHS All Ceramic Baking Decks are covered for a period of THREE MONTHS The installation of these replacement decks is the responsibility of the...

Страница 16: ...T FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment For Warranty Service and or Parts this information is required Model Number Serial Number D...

Страница 17: ...NOTES...

Страница 18: ...nouncements and events on social media 1307 N Watters Rd Ste 180 Allen Texas 75013 Phone 800 527 2100 Fax 914 576 0605 bakerspride com 4 15 2019 Social icon Square Only use blue and or white For more...

Отзывы: