7. Next, pull one end of the conveyor belt over the top of the sprockets, (being sure to line
the links up properly with the sprockets) bring the two ends together.
8. Reinstall the previously removed master links as shown in step 2 & 3 in
Figure “B”
(Above) Unhook the last link of the conveyor, farthest away from you, and re-thread
through the other end, and reconnect back onto itself.
9. Examine the oven to assure proper installation, once satisfied, install crumb trays if you
have not done so.
***DO NOT OPERATE UNIT WITHOUT CRUMB TRAYS INSTALLED.***
10. Reconnect oven to power supply and check for proper operation.
How To’s:
Replacing the Tube Heaters:
Step 1.
DISCONNECT POWER SOURCE.
Step 2.
Remove the top cover panel. By removing the truss head screws. Pull the top
cover panel out slightly.
Step 3
. Remove each heater tube wires which are requiring replacement from its terminal
block connection. One
tube at a time.
Step 4
. Remove heater tube retainer by removing retainer screws with washer.
Step 5.
Gently, pull defective heater tube out of unit.
Step 6.
Gently, put new heater tube into unit.
Step 7.
Replace heater tube retainers.
Step 8.
Reconnect the heater tube wires to the terminal block.
Step 9.
Install top cover panel.
Step 10.
Connect unit to power source and test unit for proper operation.
Содержание BMCB001
Страница 12: ...Parts Break Down Multi View Side View...
Страница 13: ...Top View...
Страница 14: ......
Страница 15: ......
Страница 16: ...Front View...
Страница 18: ......