background image

Step

 

8

. Put new motor in place and attach loosely with mounting screws. 

 

Step

 

9.

 Replace sprocket on motor shaft. PEASE NOTE: The two sprockets must line up 

flush with each other, so the chain does not twist any during operating. Also the hub gets 
installed closest to the motor. 

 
Step

 

10.

 

Slide motor unit the drive chain has about 1/4” slack when lightly pushed at the 

center of its top open run. (See chain tensioning illustration below.) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
Step

 

11

. Tighten screw to secure motor. 

 

Step

 

12

. Rewire leads. 

 

Step

 

13.

 At this time you may plug unit in and test for proper operation prior to reinstalling 

panel and turning unit back over onto its feet. 
 

Step 14

. If unit is working correctly, turn unit off and unplug unit completed. 

 

Step

 

15

. Reinstall side panels and control box cover. Place unit back into its upright 

position. Reinstall the crumb tray. 
 

Step

 

16.

 Connect unit to power source and test unit for proper operation. 

 
 

 
 
 
 

Содержание BMCB001

Страница 1: ...Conveyor Baker BMCB001 Operations Manual Questions Contact Us Toll Free 1 800 565 2253 Email Info BakeMax com www BakeMax com Warranty Registration www BakeMax com Warranty Registration...

Страница 2: ...instructions within this manual Be aware of your surroundings when using this machine ensure there are no children or any other persons who are near the machine before operating Do not put hand near...

Страница 3: ...thed heaters 2 above 2 below conveyor regulated by separate controls Adjustable heat 158 F 500 F 70 C 260 C TouchSafe with its burn proof design prevents accidental burns during operation Variable spe...

Страница 4: ...0 C 10 5 2 194 230 F 90 110 C 8 50 3 266 284 F 130 140 C 7 45 4 284 311 F 140 155 C 6 35 5 311 356 F 155 180 C 5 45 6 365 401 F 185 205 C 5 05 7 401 428 F 205 220 C 4 20 8 464 500 F 240 260 C 3 30 9 4...

Страница 5: ...out on a regular basis to isolate and or observe any unforeseen failure or safety concern Daily Cleaning of Conveyor Baker 1 Turn main power switch to the OFF position Disconnect unit from power sour...

Страница 6: ...rth across the surface of the conveyor belt as the belt moves past See Figure A below Continue until the entire belt is clean Make sure the crumb tray is installed this will minimize the amount of par...

Страница 7: ...e C Below 4 Clean conveyor belt in deep sink caustic cleaners may be used For a heavy soiled conveyor belt soak overnight in hot soapy water Warning Do not attempt to clean the heater tubes 5 Take thi...

Страница 8: ...0 Reconnect oven to power supply and check for proper operation How To s Replacing the Tube Heaters Step 1 DISCONNECT POWER SOURCE Step 2 Remove the top cover panel By removing the truss head screws P...

Страница 9: ...ly cord to fan motor Step 8 Replace back panel and enclosure Step 9 Connect unit to power source reinstall the crumb tray and test unit for proper operation Replacing Belt Drive Motor Step 1 DISCONNEC...

Страница 10: ...shed at the center of its top open run See chain tensioning illustration below Step 11 Tighten screw to secure motor Step 12 Rewire leads Step 13 At this time you may plug unit in and test for proper...

Страница 11: ...cloth to clean the air intake The procedure should be done at least once a week Lubricate the Sprockets Chains Montly Step 1 DISCONNECT POWER SOURCE Step 2 Remove the panel which exposes chain drive...

Страница 12: ...Parts Break Down Multi View Side View...

Страница 13: ...Top View...

Страница 14: ......

Страница 15: ......

Страница 16: ...Front View...

Страница 17: ...Tube Element Position 23 24 Fan with Protection Position 25 Drive Motor Complete Position 26 4P On Off Switch Position 27 Switch Protection Position 28 1 Ego Switch 250C for Controlled Upper Heater P...

Страница 18: ......

Отзывы: