General Procedures for Erecting & Installing in Miscellaneous Footing Devices.
2.1 Every Jumbrella comes with its bottom major pole end factory-preassembled relative to the type of Bahama
footing component that was selected by the orderer, and that either was shipped together with the umbrella
or had been shipped ahead for preparatory works on site. Such factory-anticipated preassembly also comprises
wiring/ earthing and plug connection if the umbrella concerned was ordered to be with (optional) built-in
Bahama »Light« or »Magic« a/o »Sound« or Bahama »Heater« and »Light« or »Magic« a/o »Sound« respectively.
2.2 Every Jumbrella coming factory-equipped with its suitable ADAPTER (massive aluminium rail insert). Its primary
function is to stiffen and reinforce the major pole in its most stressed sector extending from the top rim of the
pole’s exterior sleeve up to some 20 cm above. Furthermore, since being the interiorstiffening & reinforcing
element inside the major pole, the ADAPTER offers all tapholes (visible behind and concentric with respective
bore-holes in walls of major pole and exterior sleeves) necessary for final on-site installation of the umbrella in
the predetermined type of footing. Eventually, the ADAPTER comes with firmly built-in plug unit where the
counter-plug at the uppermost end of the 230-(or 108/130-) volt AC feed cable (from position of the external
ON/OFF control box, in & through the ground, conduit extension and in-ground sleeve [in concrete] further up)
is to be plugged in during installation of the umbrella(s)
factory-equipped with optional Bahama »Light« or
»Magic«.
2.3 Except for with »Light«/»Magic« and/or »Sound«-equipped Jumbrella editions coming factory-preassembled
to be installed in »Universal In-Ground [concrete] Sleeve« # 0451-99/E or #1451-99/E and Jumbrella models
from Ø 5.6 m round, from 5.00 x 5.00 m square and from 5.00 x 3.75 m rectangular, respectively, the ADAPTER
is coming with its entire length wholly inserted flush with the bottom end of the major pole of the structure
and, during transport, is held in position by a visible fastening screw some 30 cm up from the bottom pole end.
Such ”wholly-inserted” supply status to be maintained unchanged o n l y i f the structure – come it with or
without Bahama »Light«/»Magic«/»Sound« – is going to be installed in either a »3-piece Universal In-Ground
Base« with tipping joint, a Bahama »Portable Universal (heavy-weight) Foot« from the # U333-line, or in the
Bahama »Heavy-Duty Flat (steel-plate) Foot« # 0334/E; # 0334-10/E; # 0335/E or # 0335-12/E. The ADAPTER of
the Jumbrella XL generally remains wholly inserted in the major pole!
– In contrary to that:
Remark: All permanent installation systems based on whatever type of BAHAMA »Universal In-Ground Sleeve« [#
0451-99/E or 1451-99/E] or »Asymmetric Universal Underground Footing« console [# CHIRA-0451/2007
or CHIRA-1451/2007] have in common that – on completion of installation of the structure – the interior
ADAPTER is to extend half-way (≈ 32-33 cm) ”down” into the receiving sleeve in concrete, and half-way
”up” into the major pole of the structure. In this case either disengage the wholly inserted ADAPTER by
unscrewing the aforementioned fastening screw (remove wholly, temporarily) and pull it out of the
bottom pole end or – in case of the aforementioned models – insert the ADAPTER into the major pole.
Screw in again & tighten the fastening screw (with its soft plastic washer). The correct amount of the
ADAPTER’s extension is positively achieved as its ’new’ i.e. alternate receiving tap-hole shows up in, and is
concentric with, the mere borehole in the exterior pole wall; so no precision measuring required to re-
engage the ADAPTER inside the pole.
2.4 It would lead too far herein to refer to the individual specific working steps required for final installation as
these steps vary relative to both the umbrella model/size & equipment (with/without »Light«/»Magic«;
»Heater«, etc.) and its applicable type of Bahama footing device as this was selected when ordering. Said steps
are referred to in additional specific documentations (drawings, descriptions, etc.).
3.
Common Posterection, Unfolding & Tensioning Steps.
Содержание Jumbrella
Страница 1: ... 2019 Bahama GmbH Germany www bahama de Important Information Jumbrella ...
Страница 11: ...Jumbrella Operating Instructions Page 1 ...
Страница 12: ...Page 2 ...
Страница 26: ...Page 16 ...
Страница 27: ...Page 17 ...
Страница 55: ......
Страница 56: ......