45
6
Install (5) roof panels on opposite side of roof following STEPS 1 - 5, beginning at the front gable.
5
Temporarily back-out the lower (6) screws from metal panels and eave trim (Fig. F).
Beginning at the front panel, tuck (4) foam enclosures in between roof panels and eave trim.
Reinstall screws.
METAL ROOF PANELS
PARTS REQUIRED:
Closure Strip
24" (61 cm)
x8
Fig. F
Remove and
re-insert screws
Front
x18
1-1/2" (3,8 cm)
Содержание GARDEN SHED
Страница 2: ...This page intentionally left blank...