42
1-1/2" (3,8 cm)
Screws
Using (2) clamps, tightly clamp a string or chalkline to front and back gable trim.
Position string flush to top corner edge of gable trim
(Fig. A, Fig. B)
.
2
Front
METAL ROOF PANELS
PARTS REQUIRED:
BEGIN
¸
1
Fig. A
Mark each center line dimension shown on top of gable trim. Place the first roof panel with front bottom corner
centered on the gable trim
(Fig. C)
and bottom edge in line with string. Referencing the center line marks on top
of the gable trim, secure panel to soffit trim and purlins using (3) 1-1/2" screws.
Install screws in panel valley
(Fig. D)
nearest edge.
Fig. D
Roof Panel
Valley
Metal Roof Panel
25-5/8" x 46-3/4" (65,1 x 118,7 cm)
x1
x3
1-1/2" (3,8 cm)
NOTE: Panels must
remain flush
to string during
installation!
Fig. B
BEGIN HERE
Roof panel
centered
on trim
Fig. C
Flush e
dge
to string
Clamp
String
Clamp
String
Flush string
to top corner
Flush string
to corner
Clamp string
here
3-1/4"
(8,3 cm)
23-3/4"
(60,3 cm)
44"
(
111,8 cm)
Содержание GARDEN SHED
Страница 2: ...This page intentionally left blank...