43
10' WALL 01 or 03 INSTALLATION
3" (7,6 cm)
x2
3" (7,6 cm)
x8
2
Place 10' wall on floor centered between 16' walls.
Secure wall with 2" screws into top and bottom plates
(Fig. A, Fig. B)
.
Secure wall to bottom plate first.
BEGIN
1
Nail lower edge of panels to floor with 2"
nails spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Nail panels to 10' wall studs with 1-1/2"
nails spaced 6" apart.
ENSURE PANEL CORNERS ARE FLUSH.
Your walls are now installed.
FINISH
CUT OUT AND REMOVE BOTTOM PLATE
AT DOOR OPENING.
REMOVE TEMPORARY BRACING.
2" (5,1 cm)
x10
1-1/2" (3,8 cm)
x26
2" (5,1 cm)
x4
PARTS REQUIRED
Secure wall top plates with 3" screws
at each corner at an angle
(Fig. D)
.
3
2" (5,1 cm)
Screw
Flush
Flush
Fig. A
Fig. B
2"
(5,1 cm)
Screw
STANDARD:
DOOR LOCATED
ON 10' GABLE WALL
2" (5,1 cm)
Nails
1-1/2"
(3,8 cm)
Nails
6"
(15,2 cm)
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
Nail 2" nails first.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails
6"
(15,2 cm)
Содержание 16835-W
Страница 2: ...This page intentionally left blank...