Fort Assembly
Phase 9
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (2) M4 - WALL BOARD - W101510
• (3) M16 - WALL BOARD - W101732
• (8) M15 - WALL BOARD - W101506
Hardware needed:
• (38) BR - SCREW PFH 8x1-1/8 - H100088
Step 1: Pre-drill and attach 'M4', 'M15' &
'M16' Wall Boards to 'M9' Wall Rail, 'L1'
Wall Rail and 'M12' Wall Rails using
Screws 'BR', as shown.
M4
M4
M16
M16
M15
M16
M15
BR
BR
M15
M15
M9
L1
M12
M12
Note: It is vital that the fort
be level before and after
each phase of assembly.
Note: Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.
Note: Due to the changing size of the wood
as a result of moisture content, you may
need to adjust the spacing of your wall slats
1/16" to 1/8" when assembling walls. It would
be best to line up the boards on the wall
before attaching to estimate if a larger or
smaller gap is needed.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.