Fort Assembly
Phase 2
H
AC
AC
D
AD
AD
E3
L2
BG
E2
BG
CK
BG
J1
J1
L
AC
H
AC
AC
AD
AD
D
Step 4: Attach 'J1' Floor Support to 'E2'
& 'E3' Tower Legs using Screws 'CK',
as shown.
Step 3: Attach 'H2' Floor Rail using
Bolts 'L', Washers 'AC', and previously
assembled T-Nut 'BG', as shown.
Step 2: Attach 'L2' Wall Rail & 'K1' Base
Board to 'E2' & 'E3' Tower Legs using
hardware 'D', 'AD', 'AC' and 'H', as
shown.
Step 1: Using a hammer, insert all the
'BG' T-Nuts into the respective boards,
as shown.
Phase Notes
• Assemble with hardware as shown.
• For ease during assembly, assemble uprights flat on the ground.
Parts needed:
• (1) E2 - TOWER LEG - W101445
• (1) E3 - TOWER LEG - W100450
• (1) L2 - WALL RAIL - W101487
• (1) H2 - FLOOR RAIL - W101457
• (1) K1 - BASE BOARD - W101451
• (2) J1 - FLOOR SUPPORT - W101037
Hardware needed:
• (8) D - NUT BARREL WH 5/16x7/8 - H100005
• (8) AD - WASHER LOCK EXT 12x19 - H100031
• (10) AC - WASHER LOCK EXT 8x19 - H100030
• (8) H - BOLT WH 5/16x1-1/2 - H100010
• (2) L - BOLT WH 5/16x2-1/4 - H100013
• (4) CK - SCREW PFH 8x2 - H100111
• (5) BG - T-NUT 5/16 - H100074
Note: It is vital that the fort
be level before and after
each phase of assembly.
H2
K1