Phase Notes
• Assemble with hardware as shown.
Hardware needed:
• (30) BR - SCREW PFH 8x1-1/8 - H100088
Parts needed:
• (4) H3 - ROOF RAFTER - W101502
• (2) N1 - GABLE BOARD - W100590
• (2) N6 - GABLE BOARD - W100593
• (4) N7 - GABLE BOARD - W100594
• (2) L7 - GABLE MOON - W100572
Fort Assembly
Phase 21
Step 1: Pre-drill and attach 'N1' Gable Board to
'H3' Roof Rafters using Screws 'BR'. Attach
'N6' Gable Board to 'H3' Roof Rafters using
Screws 'BR'. Attach 'N7' Gable Boards to 'H3'
Roof Rafters using Screws 'BR', as shown.
L7
BR
N1
H3
H3
N7
N6
N7
BR
BR
BR
BR
BR
N1
H3
H3
L7
N6
N7
N7
Step 2: Pre-drill and attach 'L7' Gable Moon to
'N1', 'N6', & 'N7' Roof Rafters using Screws
'BR', as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.