QTY
DESCRIPTION
2
CENTER SLIDE BRACE
24
SCREW PFH 8x3
1
SLIDE RAIL 8' GREEN RIGHT
1
SLIDE RAIL 8' GREEN LEFT
SLIDE RAIL 8' GREEN LEFT
SLIDE RAIL 8' GREEN RIGHT
CENTER SLIDE BRACE
8 FOOT SLIDE ASSEMBLY
PHASE 2
Phase Notes
●
PLACE 1 SLIDE RAIL ON A FLAT SURFACE AND BEGIN INSERTING SLIDE BED AT THE BOTTOM OF THE
SLIDE RAIL. PUT SLIDE SUPPORT BOTTOM INTO THE SUPPORT POCKET AT THE BOTTOM OF THE
RAIL AND HAVE A HELPER BEND THE SLIDE BED TOWARDS THE TOP OF THE SLIDE AND INSERT
THE BED INTO THE SLIDE CAVITY. MAKE SURE SLIDE BED IS COMPLETELY DOWN IN THE SLIDE
CAVITY.
●
PLACE THE OTHER SLIDE RAIL ON A FLAT SURFACE WITH THE SLIDE CAVITY UP. HAVE A HELPER
HOLD THE TOP END OF SLIDE BED AND BEGIN INSERTING THE SLIDE BED AND SLIDE BRACES INTO
THE CAVITY AND SUPPORT POCKETS STARTING AT THE BOTTOM OF SLIDE AND WORKING UP TO
THE TOP.
●
ONCE BED AND BRACES ARE COMPLETELY IN THE CAVITY AND IN THE SUPPORT POCKETS, SECURE
USING 3" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN BELOW
.
TIP: A HELPER IS REQUIRED FOR THIS PHASE.
SCREW PFH 8x3