Assembly
Phase 11
Parts needed:
• (1) WP - PORCH GABLE - W101836
• (4) R2 - PORCH ROOF SLAT RIGHT - W101841
• (4) R3 - PORCH ROOF SLAT LEFT - W101842
• (1) O10 - RIDGE CAP LEFT - W101820
• (1) N14 - RIDGE CAP RIGHT - W101821
• (2) M10 - PORCH RAFTER BACK - W101822
Phase Notes
• Assemble with hardware as shown.
Hardware needed:
• (32) BP - SCREW PFH 8x1-1/2 - H100086
• (6) BR - SCREW PFH 8x1-1/8 - H100088
• (1) BT - SCREW PFH 8x2-1/2 - H100090
Step 1: Pre-drill and insert 'BT' Screw into 'M10'
Porch Rafter, as shown. Next, using 'R2' Porch
Rafter as a template, pre-drill & attach (1) 'R2'
Porch Roof Slat Right and (1) 'R3' Porch Roof
Slat Left to 'WP' Porch Gable and 'M10' Porch
Rafter Backs using screws 'BP', as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Step 2: Using 'R2' & 'R3' Roof Slats as a
template, pre-drill & attach the remaining 'R2'
Porch Roof Slat Rights and 'R3' Porch Roof
Slat Lefts to 'WP' Porch Gable and 'M10' Porch
Rafter Backs using screws 'BP', as shown.
Step 3: Attach 'O10' Ridge Cap Left and 'N14' Ridge
Cap Right to the peak of the porch roof assembly
using screws 'BR', as shown.
BP
BP
R2
M10
WP
R3
BP
R2
R2
R2
R3
R3
R3
BP
O10
BR
BR
N14
BT
M10