Assembly
Phase 10
Phase Notes
• Assemble with hardware as shown.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Note: It is vital that the fort
be level before and after
each phase of assembly.
RP1
RP1
BP
WP10
BP
BP
WP7
O1
BR
RP1
BR
RP1
N1
Slide this surface upward
to mate with 'RP1'.
Mate this surface to
'WP1' & 'WP2'.
N30
Step 3: Mate 'N30' Fill Trim to the surface of 'WP1'
& 'WP2' wall panels and slide 'N30' upward until it
touches 'RP1' Roof Slat. Next, attach 'N30' Fill Trim
to 'WP1' & 'WP2' wall panels using screws 'BR', as
shown.
Step 1: Starting at the peak and using
'RP1' as a template, pre-drill & attach
(1) 'RP1' Roof Panel to the center of
edges of 'WP7' & 'WP10' gable ends
using screws 'BP', as shown.
Step 2: Using 'O1' & 'N1' as templates,
pre-drill & attach 'O1' Ridge Cap Left &
'N1' Roof Ridge Cap Right over the
peak of 'RP1' roof panels using screws
'BR', as shown.
Parts needed:
• (2) RP1 - ROOF PANEL - W101828
• (1) O1 - RIDGE CAP LEFT - W101830
• (1) N1 - ROOF RIDGE CAP RIGHT - W101829
• (2) N30 - Fill Trim - W102102
Hardware needed:
• (56) BP - SCREW PFH 8x1-1/2 - H100086
• (15) BR - SCREW PFH 8x1-1/8 - H100088
BR
N30
BR
N30