background image

10/08/2008

- BEFORE YOU BEGIN -

Includes 8’x 10’  (244x305 cm)

Building Instructions

We manufacture kits from select construction grade lumber and engineered wood products.  Construction grade
lumber, a product cut from trees, has many natural characteristics and blemishes that may be present in some of
the pieces you receive in your kit. Natural characteristics and blemishes in construction lumber may include knots,
torn wood grain along edges, minor cracks/splits, twists, limited bark along edges and pitch pockets that may exude
sap. Be assured that the individual parts have been cut and inspected to remove as many of the wood’s natural,
less appealing characteristics as possible. These characteristics and/or blemishes will not affect the strength,
durability, or structural integrity of the finished product. Generally, the exterior trim parts selected for your kit are
graded from only one side and should be installed with the most attractive side outward.  Our limited warranty does
not cover the natural characteristics and blemishes that occur with construction grade lumber products.

- ANTES DE EMPEZAR -

Customer Service
(Servicio al cliente)
1-888-827-9056
1000 Ternes  Drive
Monroe, MI 48162

Tools required

(Herramientas
necesarias)

 Electric Drill

(Taladro eléctrico)

 

Hammer

(Martillo)

 Phillips

Screwdriver
(Desarmador cruz)

 Level

(Nivel)

 Ladder

(Escalera)

 Pencil

(Lápiz)

 Tape Measure

(Cinta métrica)

 Utility Knife

(Navaja)

 Paint Tools

(Herramientas
 para pintar)

 Caulk Gun

(Pistola para
masillado)

Optional Tools

(Herramientas
opcionales

)

 Chalk Line

(Línea de marcar)

 Square

(Escuadra))

Building / Edificios

8’x 10’

(244 x 305 cm)

16759

Instrucciones para edificios de

8’x 10’ (244x305 cm)

Fabricamos nuestros equipos de madera elaborada y de productos maquinados de madera. La madera
elaborada, producto de árboles, tiene muchas características e imperfecciones naturales que puedan tener
algunas piezas contenidas en el equipo. Estas imperfecciones y características pueden incluir nudos, grano
rasgado sobre el borde, rajas/grietas pequeñas, torsiones, cortezas en el borde, y bolsos que exuden savia.
Asegurams que hemos cortado e inspeccionado las partes individuales para eliminar las características
naturales menos atractivas posibles. Estas características y/o imperfecciones no afectarán la fuerza,
durabilidad ni la integridad estructural del producto final. Po lo general, las piezas de moldura exterior
seleccionadas para su equipo se elaboran de un solo lado y deben ser instaladas con la parte más atractiva
por fuera. Nuestra garantía limitada no cubre las características e impefecciones que ocurren con los
productos de madera elaborada.

8’ x 10’ Gable

244 x 305 cm Aguilón

First...

 

Check with your local building authority before erecting.

 

Read instructions thoroughly before you begin.

Building Codes

 

Our buildings are designed to meet most local and national

   U.S. codes and are not meant to be used for living space.

 

General construction drawings can be provided.

Check All Parts

 

If a part is missing, circle the part in question and call.

● 

 

Please note the primer color may vary on siding and

   trim parts. This is a factory applied primer intended for
   preparing your building for painting. This is NOT a
   finish coat. This primer color variation will not affect
   the look of your building once painted.

Important

 

Lumber is graded from one side, use most attractive

   face to the outside.

 

In a drawing, a dotted line represents a part hidden

   from view (like a part under a panel).

Assistance required

 

Assistance is necessary to handle, fit, and secure

    some components.

Squareness is very Important!

 

Keep 90° corners and 90° perpendiculars throughout

   the assembly to ensure all components fit together.

Check foundation size

 

Before starting on your foundation, make sure you are

   building the correct size foundation for your building.

Safety!

● 

Check for protruding nails,  pound any protruding

   nails into the wood or cut them off flush

Always wear OSHA-APPROVED safety

glasses throughout assembly process.

Primero...

 

Consulte la autoridad de construcción local antes de

construir el edificio.

 

Lea las instrucciones completamente antes de empezar.

Códigos de Construcción

 

Hemos diseñado nuestros edificios a que conformen con

todos los códigos de construcción locales y nacionales.  Los
edificios no están proyectados como residencia.

 

Se disponen planes generales de construcción.

Compruebe todas las piezas

 

Si falta una pieza, indícala con un círculo y llámenos.

 

 

Aviso:  El color del imprimador puede variar en la

covertura y las partes de la moldura.  Este imprimador se
aplica en la fábrica y es para preparar  su edificio para
pintar.  NO es una capa de pintura terminada.  La variación
en el color del imprimador no afectará la apariencia de su
edificio al pintarlo.

Importante

 

La Madera está elaborada en un solo lado. Use el lado

más atractivo en el exterior.

 Si falta una pieza, póngale un círculo y llámenos.

 En un dibujo una línea punteada representa una pieza no

   vista (por ejemplo, una pieza debajo de un panel)

Ayuda requerido

 

Seleccione un sitio nivelado.

 

Será necesario pedir ayuda para manejar, unir, y reforzar

algunas piezas.

¡Es preciso escuadrar el edificio!

 

Mantenga ángulos de 90° en las esquinas y los

perpendiculars durante la construcción para asegurar que
todas las piezas se unen correctamente.

Comprueba las dimensiones de la

cimentación.

 

Compruebe que las dimensiones de la cimentación son

las correctas para el edificio.

¡Seguridad!

●  

Inspeccione para clavos sobresalientes; hinque cualquier

  clavo sobresaliente en la madera o córtelo nivelados con la
  madera

Siempre lleve gafas de seguridad

aprobadas por OSHA durante la

construcción.

Содержание 16759

Страница 1: ...7 00 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST ANTES DE DEVOLVERLO LL MENOS Si desea m s informaci n sobre el montaje ll menos sin coste adicional algun...

Страница 2: ...This page intentionally left blank Esta p gina est intencionado en blanco...

Страница 3: ...hority before erecting Read instructions thoroughly before you begin Building Codes Our buildings are designed to meet most local and national U S codes and are not meant to be used for living space G...

Страница 4: ...DURA WALLS x1 OY MURO x2 x1 B PJ V 2x3x68 1 4 5x7 6x173 cm x1 2x3x56 3 4 5x10x144 cm x1 F 2x3x9 5x7 6x23 cm G 48x73 1 2 122x187 cm J N x2 O GI x1 WBL x2 4 4 x3 x26 2 5x7 6x66 cm 4 4 x4 x60 1 4 2 5x10x...

Страница 5: ...4 x 33 x 32 Actual Size Dimensiones verdaderas x2 3 4 1 9 cm x12 x2 3 7 6 cm x 120 2x4x24 5x10x61 cm x1 2x4x69 5x10x175 cm P1 P3 1 1 4 3 0 cm 2 5 0 cm x 16 x 56 Vent Abertura P2 P4 2x4x72 5x10x183 cm...

Страница 6: ...LOS MATERIALES ANTES DE EMPEZAR A MONTAR SU EDIFICIO Wood is a natural product that has inherent blemishes All interior framing is graded for structural strength and not appearance Exterior trim is g...

Страница 7: ...TE SLAB OPCIONES PARA LA CIMENTACI N HAY QUE CONSTRUIR EL EDIFICIO SOBRE UN BASE DE MADERA O DE CONCRETO Base en losa de concreto Treated Sill Soleras Inferiors Tratadas PREPARACI N DEL SITIO El sitio...

Страница 8: ...6 FLOOR FLOOR PISO PISO x 24 3 7 6 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm P3 x5 P2 P1 24 61 cm 24 61 cm 24 61 cm 24 61 cm P2 x 24 3 7 6 cm P1 P6 x5 P1 P2 P1 P2...

Страница 9: ...7 FLOOR FLOOR x 172 2 5 cm PISO PISO x 12 3 7 6 cm P5 P5 Flush Al ras Flush Al ras Flush Al ras Flush Al ras Flush Al ras P4 FRONT FRENTE 6 15 cm P5 12 30 cm P4 FRONT FRENTE...

Страница 10: ...8 GABLE PANEL x 8 2 5 cm ENTREPA O DE AGUIL N FRONT FRENTE Flush Al ras F G 6 15 cm 6 15 cm 1 1 4 3 cm 3 4 1 9 cm 1 1 4 3 cm 3 4 1 9 cm NA...

Страница 11: ...9 GABLE PANEL x 10 2 5 cm ENTREPA O DE AGUIL N BACK POSTERIOR Flush Al ras H K 1 1 4 3 cm 3 4 1 9 cm 1 1 4 3 cm 3 4 1 9 cm 5 13 cm MJ...

Страница 12: ...10 SIDE WALL MURO LADO x 10 3 7 6 cm A B 1 4 6mm x2 Flush Al ras A Flush Al ras 1 4 6 mm 1 1 2 3 8 cm 1 1 2 3 8 cm Flush Al ras A A A A B...

Страница 13: ...BACK WALL x 4 3 7 6 cm MURO POSTERIOR Center Centro OY MJ PJ Flush Al ras BACKWALL Temporary support Apoyo no permanente D C Flush Al ras Center Centro 1 3 4 4 5 cm 1 3 4 4 5 cm PJ OY C D MURO POSTERI...

Страница 14: ...12 BACK WALL MURO POSTERIOR FRONT WALL x 6 3 7 6 cm MURO FRENTE Flush Al ras Flush Al ras x 38 2 5 cm E E OY MJ 1 3 4 4 5 cm 2 1 2 6 3 cm 2 1 2 6 3 cm D C 1 3 4 4 5 cm...

Страница 15: ...13 ERECTING WALLS CONSTRUYENDO LOS MUROS 3 7 6 cm x10 FRONT WALL MURO FRENTE Flush Al ras Flush Al ras x 8 2 5 cm FRONT FRENTE Flush Al ras Temporary support Apoyo no permanente B...

Страница 16: ...0 ERECTING WALLS CONSTRUYENDO LOS MUROS 3 7 6 cm x10 FRONT FRENTE Flush Al ras Temporary support Apoyo no permanente Level wall and nail Nivele la pared y clave Centre la asamblea de la pared sobre el...

Страница 17: ...15 3 7 6 cm x 6 ERECTING WALLS CONSTRUYENDO LOS MUROS 3 7 6 cm x 6 ERECTING WALLS CONSTRUYENDO LOS MUROS 3 7 6 cm x 8 2 5 cm x 74 6 15 cm 6 15 cm 6 15 cm...

Страница 18: ...16 3 7 6 cm x 6 ERECTING WALLS CONSTRUYENDO LOS MUROS 3 7 6 cm x 6 2 5 cm ERECTING WALLS CONSTRUYENDO LOS MUROS x 8 2 5 cm x 26 6 15 cm Flush Al ras HJ Center Centro Flush Al ras...

Страница 19: ...17 3 7 6 cm x 6 GABLE PANEL 2 5 cm x 16 3 7 6 cm x 4 ENTREPA O DE AGUIL N 3 7 6 cm x 6 TRIM 1 1 4 3 cm x 56 MOLDURA T x4 Flush Al ras 3 7 6 cm 2 5 cm...

Страница 20: ...18 3 7 6 cm x 6 GABLE PANEL 2 5 cm x 16 3 7 6 cm x 4 ENTREPA O DE AGUIL N 3 7 6 cm x 6 VIGA RAFTER 2 5 cm x 24 96 244 cm WJ x4 J 28 1 2 72 cm 28 1 2 72 cm 3 7 6 cm 2 5 cm...

Страница 21: ...ntain truss dimension Asegure la dimensi n igual entre vigas 22 1 8 56 cm 22 1 2 57 cm 22 1 8 56 cm N M O 22 1 2 57 cm 22 1 2 57 cm N O L L M Flush Al ras Flush with gable panel Al ras hacia entrepa o...

Страница 22: ...OLDURA 2 5 cm x 24 3 7 6 cm x 6 PUERTA DOOR x 8 3 7 6 cm PARTE SUPERIOR TOP PUERTA DOOR 3 8 1 0 cm 3 8 1 0 cm OO W V Temporary support Apoyo no permanente Flush Al ras Flush Al ras Flush Al ras WBL WB...

Страница 23: ...de 3 7 6 cm primero Center Centro Remove after doors are screwed Check doors to open properly Quite despu s de fijar la puerta con tornillos compruebe que las puertas abren bien Install Tip Add Ledge...

Страница 24: ...Inside of Door Interior de la Puerta Drill Taladro 3 8 0 9 cm Hole Hoyo x6 2 Screws x6 5 cm Tornillos 2 Screws 5 cm Tornillos x6 2 Screws x6 5 cm Tornillos 3 4 1 9 cm x12 x2 x 12 2 5 0 cm OO 36 91 cm...

Страница 25: ...23 BATTENS LISTONES VENT ABERTURA LEVEL NIVEL Caulk Aplique el masillado aqu X x8 24 61 cm 24 61 cm 24 61 cm 24 61 cm 2 5 cm x 48 24 61 cm...

Страница 26: ...tex Caulk that is paintable Caulk at all horizontal and vertical seams between the Trim and Walls and all around the door trim Use a high quality exterior acrylic latex paint When painting your buildi...

Страница 27: ...das Okay if shingle overlaps Install first row backwards Instale la primera fila al rev s Est bien si la teja sobresale Flush to drip edge Al ras al gotero Line up notch on top of Shingle with edge of...

Страница 28: ...cione para clavos sobresalientes hinque clavos sobresalientes en la madera or c rtelos nivelados con la madera Keep grass trimmed and away from building Corte y quite la hierba cerca del edificio Keep...

Страница 29: ...vertura y el entablado est n garantizados por dos a os 5 La covertura SmartSide est garantizada por 10 a os para los edificios Marco Series y por 15 a os para los edificios Premier Series 6 La covertu...

Отзывы: