36
Scope of delivery
No.
Quantity
Designation
1
1
Monitor kit RV-49( (see
✎
✎
✎
✎
✎
C)
1.1
1
Monitor
1.2
1
Sun shield
1.3
1
Monitor holder
1.4
1
Supply cable
1.5
4
Knurl screws of monitor
1.6
4
Sheet metal screws 5 x 20 mm
1.7
4
Machine screws
1
Foil with removal marks (without illustration)
2
1
Camera kit RV-19
2.1
1
Camera
2.2
1
Camera holder
2.3
1
System cable 20 m
2.4
6
Hexagon socket screw
M 4 x 8 mm
Necessary tool
The following is required for installation and assembly:
–Scale (ruler) (see
✎
B 1)
– Drilling machine
(see
✎
B 5)
–Prick punch (see
✎
B 2)
– Screwdriver
(see
✎
B 6)
–Hammer
(see
✎
B 3)
– Screwdriver
(see
✎
B 7)
–Drill
(see
✎
B 4)
The following are required for the electrical connection and the
check
–Diode test lamp
(see
✎
B 8)
– heat shrink hose
or voltmeter
(see
✎
B 9)
– hot-air drier (see
✎
B 12)
–Crimp pliers
(see
✎
B 10)
– hatchet iron (see
✎
B 13)
–Insulating tape
(see
✎
B 11)
– soldering tin (see
✎
B 14)
Due to your individual assembly, perhaps you still need other screws,
nuts, washers, metal screws and cable clips than those contained in the
scope of supply for the fastening of the camera and monitor.
A5_921-02 -GB- RV 250 neu.p65
18-09-2003, 11:30
36
Содержание RV-250
Страница 2: ...A5_921 02 Umschlag RV 250 p65 18 09 2003 11 30 2...
Страница 4: ...4 B 2 4 3 5 6 10 12 13 14 8 9 7 1 11 A5_921 02 Bilder RV 250 neu p65 18 09 2003 11 30 4...
Страница 6: ...6 E 3 2 1 1 2 3 4 5 7 6 D A5_921 02 Bilder RV 250 neu p65 18 09 2003 11 30 6...
Страница 13: ...13 H 15 mm 10 mm 20 mm 10 mm 1 6 11 2 7 12 3 8 4 9 5 10 A5_921 02 Bilder RV 250 neu p65 18 09 2003 11 30 13...
Страница 17: ...17 A5_921 02 Bilder RV 250 neu p65 18 09 2003 11 30 17...