39
GB
– Check beforehand whether sufficient free space for the drill
outlet is present.
– In order to prevent a running of the drill, prick punch before with hammer
and prick punch-
– Debur all drill holes and provide with rust protection.
◆
Drill at the points drawn before a hole
of Ø 4 mm
◆
Screw on monitor holder with the metal screws 5 x 20 mm.
Necessary parts for the attachment of the monitor holder
see
✎
F 6 to F 8.
When attaching thread screws
The following is to be considered when making drill holes into the
plastic instrument panel.
– Check beforehand whether sufficient free space for the drill -
outlet is present.
– Pay attention that the nuts cannot pull themselves through
the intrument panel when tightening (use possibly larger washers
or sheet metal plates).
◆
Drill at the points drawn before a drilling
of Ø 5.5 mm
◆
Screw on the monitor holder with the thread screws 5 x 20 mm.
Necessary parts for the attachment of the monitor holder
see
✎
F 9 to F 11. .
Execution of the break-through for the connecting cable of the
monitor.
For the execution of the connecting cable (see
✎
F 12), use if
possible original executions or other execution possibilities, such as
e.g. lining edges, ventilation grid or blind switch. If no openings are
available, then a hole must be drilled with Ø 18 mm. Check before
whether sufficient free space for the drill outlet is present.
Assembly of the monitor
A5_921-02 -GB- RV 250 neu.p65
18-09-2003, 11:30
39
Содержание RV-250
Страница 2: ...A5_921 02 Umschlag RV 250 p65 18 09 2003 11 30 2...
Страница 4: ...4 B 2 4 3 5 6 10 12 13 14 8 9 7 1 11 A5_921 02 Bilder RV 250 neu p65 18 09 2003 11 30 4...
Страница 6: ...6 E 3 2 1 1 2 3 4 5 7 6 D A5_921 02 Bilder RV 250 neu p65 18 09 2003 11 30 6...
Страница 13: ...13 H 15 mm 10 mm 20 mm 10 mm 1 6 11 2 7 12 3 8 4 9 5 10 A5_921 02 Bilder RV 250 neu p65 18 09 2003 11 30 13...
Страница 17: ...17 A5_921 02 Bilder RV 250 neu p65 18 09 2003 11 30 17...