background image

 

User Manual 

 

 

 

- 17 - 

CHAPTER 3. FILLING THE MACHINE 

3.1.- Initial filling with soluble product 

 

Open the machine door and lift the top cover of the machine 
in order to fill the hoppers. 
Lift the cover of the hopper to be filled and fill with product. Be 
careful that the product filled corresponds to product for that 
hopper (each hopper has a label that indicates the product to 
be 
filled).

 

Recommendation: The ramp on which the product falls 
fromthe hopper should be turned upwards to prevent 
unwanted product spillage. 
 

Once the product has been filled, close the hopper cover and 
proceed to fill the next hopper. 

                 Figure 4

 

3.2.- Filling with coffee beans

 

Remove the hopper cover and dump the content of the coffee package inside until the desired 
measure is reached. 

 

If  you  prefer  to  take  the  hopper  out  of  the  machine  in  order  to  fill  it  more  comfortably, 
remember  that  the  hopper  flow  gate  must  be  closed  in  order  to  prevent  the  content  of  the 
hopper from spilling (Fig. 4). 

3.3.- Initial filling with water 

All of the machines automatically fill the boiler when the machine is started. 

BEFORE CONNECTING THE MACHINE, ENSURE THAT THE MACHINE HAS A WATER 
SUPPLY FOR FILLING THE BOILER 

(check the connection to the water supply system or 

verify that the water tank is filled

). 

3.4.- Initial programming 

The machine will be sent with the programming predefined by AZKOYEN. In order to modify 
any of the values of the functions, enter the 

basic menu 

(see chapter 4) and program the new 

functions. 

 

Recommendation: It is a good idea to identify each machine in order to record 
accounting, consumption, incidents, etc. Function 470 is available to programme said 
code

.

 

 

ATTENTION: THE ACTIONS DESCRIBED IN POINTS  3.3 AND 3.4 MUST BE 
PERFORMED WITH THE MACHINE “ON” AND THE DOOR OPEN. THEY MAY ONLY BE 
PERFORMED BY TECHNICAL PERSONNEL AUTHORISED BY AZKOYEN 

Содержание AZKOY GROUP VITRO S5

Страница 1: ...USER MANUAL VITRO S5 ESPRESSO REFERENCE MANUAL 81044280 EDICI N 09 2017...

Страница 2: ...User Manual 2...

Страница 3: ...3 1 Initial filling with soluble product 17 3 2 Filling with coffee beans 17 3 3 Initial filling with water 17 3 4 Initial programming 17 CHAPTER 4 CONFIGURATION AND PROGRAMMING 19 4 1 What is program...

Страница 4: ...ydraulic installation o Deficient cleaning or maintenance o Incorrect use of the machine o Using non original replacement parts or making unauthorised modifications AZKOYEN hereby reserves the right t...

Страница 5: ...ding machines Do not touch the product with your hands and prevent liquids from falling inside the product hoppers All elements that require tools to be disassembled must only be handled by qualified...

Страница 6: ...User Manual 6...

Страница 7: ...istics Dimensions mm Depth 590 Height Height with stand 775 1630 Width 480 Weight kg 55 5 Electrical specifications Voltage according to the characteristics plate 6V 10V Maximum consumption 1200W Char...

Страница 8: ...main components Figura 1 Figure 1 Fig 1 1 Coffee bean Hopper 2 Cabinet 3 Mixers 4 Espresso coffee unit 5 Coffee bean tray 6 Liquid spill tray 7 Soluble product hoppers Fig 2 8 Information screen 9 Sel...

Страница 9: ...User Manual 9 Figure 3 Fig 3 1 Hopper 2 Hopper flow gate 3 Mill regulating handle 4 Uper piston 5 Lower unit 6 Unit securing lever...

Страница 10: ...User Manual 10...

Страница 11: ...racteristics plaque located on the back of the machine and it must not exceed the limits set in each country Maximum consumed power according to the characteristics plaque 2 4 Water inlet Prepare a wa...

Страница 12: ...the waste bin of the stand as shown in the figure Fasten it to the shelf using the ties that have been provided 6 Attach the tube for liquid waste to the tray of the machine and guide it to the corres...

Страница 13: ...Waste container assembly according to the type of machine 5 Sensor Ties Coffee grounds tray Stand alone cantainer area Fresh Brew Tubes for solid wastes Solid wastes container Liquid waste container E...

Страница 14: ...row of labels you want to change Replace it with the desired label and press down on the label holder until the selections menu is fastened in place Once the necessary operations have been made resto...

Страница 15: ...es in order to prevent its expiry or the loss of properties The machine incorporates top level labels as an additional provision These will inform the person responsible for the loading the product wh...

Страница 16: ...User Manual 16...

Страница 17: ...n order to fill it more comfortably remember that the hopper flow gate must be closed in order to prevent the content of the hopper from spilling Fig 4 3 3 Initial filling with water All of the machin...

Страница 18: ...User Manual 18...

Страница 19: ...ing control unit in the normal sales mode SINGLE PRESS OF THE KEY KEY HELD Key A One free sale Enters into the hierarchical programming menu Key B Blender wash Shows the temp on the display Key C Ente...

Страница 20: ...t returns to editing the previous digit if it is the first number it edits the sign and if it is the sign it exist and validates Key D It advances to editing the next digit if it is the first number i...

Страница 21: ...her selection press the selection and repeat the steps Press C to end 204 SINGLE PRICE 001 SINGLE PRICE FOR ALL SELECTIONS Program a price This price is assigned to all selections 220 FREE SALE ABC FR...

Страница 22: ...lap each other in order to shorten the service time and to get the optimum mixture The service sequence of coffee with milk in the machine could thus be stated as follows 4 5 2 Function 315 PROG SERVI...

Страница 23: ...conds To Delete a step or to Create a new one simply select the desired option using the B key and press D Also if the machine detects that a product has been programmed without water after a step has...

Страница 24: ...User Manual 24...

Страница 25: ...onsist of an exclamation mark at the bottom left of the screen similar to that shown when there is an incident The machine can continue normal operation despite the notification The three meters are L...

Страница 26: ...the coffee dosage The grinder is time controlled The default dosage is 6 5 g Use the 315 function to change the grinding time and the dosage adjusting the time of the desired services Adjusting the gr...

Страница 27: ...that the water exceeds its point of boiling In cities to the level of the sea the pressure is of 1 atmosphere and the temperature of boiling of the water is of 100 C however as increases the height de...

Страница 28: ...User Manual 28...

Страница 29: ...presso machines only 3 Liquid spill tray 4 To clean lift cup by pressing B in the programming box and closing the door instantly of the machine with lift cup down Depending on the number of services t...

Страница 30: ...e above Change the coffee filter of the group see 5 4 Wash the filter using the Cleaning Cycle see 6 2 or retreat to thoroughly clean with detergent Once every 4 years or every 20 000 services Check t...

Страница 31: ...clean the upper filter with cleaning paper or a brush to eliminate any particles which may remain on the filter To dismantle the piston follow the instructions in 5 4 6 3 Exterior cleaning Do not use...

Страница 32: ...User Manual 32...

Страница 33: ...User Manual 33...

Отзывы: