Page 16
2
PRE-DRILL THROUGH
POSTS
PRE DRILL POST
SLEEVES
1
Use a scrap piece of baluster trimmed at the stair angle as a guide.
Anchor posts should not exceed 60 feet apart during any continuous run of cable.
Scrap Baluster for
drill angle
1/4”
1/8”
Drill a through hole only in the Post Sleeve
with a 1/4” drill bit at the same angle as
the stair run.
1/4”
1/8”
• Drill a 1/4” hole through
both the Post and Post
Sleeve at stair angle.
1/4”
Installing CableRail by Feeney
®
Stairs
for Evolutions Rail™ Contemporary