Page 12
Drill 3/16”
Hole
Stair Angle
4
5
6
ATTACH FOOT
BLOCKS AND
BRACKETS
ATTACH
INTERMEDIATE
BALUSTERS
• Pre-drill screw chase in
Intermediate Balusters
with a 3/16” bit.
• Attach Intermediate
Balusters to the bottom
Universal Rail using #10
x 2” screws provided.
• Trim Baluster to length
and angle. Pre-Drill
center hole.
TRIM
INTERMEDIATE
STAIR BALUSTERS
Be sure the screw finds the screw chase.
For easier installation, pre-drill screw chase with a 3/16” drill bit.
1’ to 6’ on center requires 1
Intermediate Balusters.
6’ to 8’ on center requires 2
Intermediate Balusters.
#10 x 2”
Stainless
Screws
Screw Chase
Pre-Drill
3/16”
• Attach provided brackets
to the Universal Rails.
Pre-Drill 9/64”
through Brackets
#10 x 7/8”
Coated Screws
Pre-Drill 9/64” into
Universal Rails
#10 x 2” Coated
Screws
For sections up to 6’: Place two Foot Blocks at 1/3
intervals on the rail.
For sections 6’ to 8’: Space three Foot Blocks
approximately at 1/4 intervals on the rail.
Installing Evolutions Rail™ Contemporary Stairs
with CableRail by Feeney
®