Page 15
12
INSTALL TOP RAIL
SECURE TOP
UNIVERSAL RAIL AND
PREPARE TOP RAIL
11
• Pre-Drill pilot holes
through the Post Sleeve
and into the post through
holes in the brackets of
the top Universal Rail.
• Cut the Top Rail so that
any seams fall at the
center of a post.
Make sure any seams fall at
the center of a post
Pre-Drill 9/64”
#10 x 2”
Coated Screws
3/4”
1 1/2”
Top Rail Screw Placement
2’
2’
Pre-Drill 3/16”
#8 x 2 1/2”
Coated Screws
Pre-Drill 3/16” through
Universal Rail
Pre-Drill 9/64” through hole
in Universal Rail into up into
Top Rail
#10 x 1 1/2” Coated Screws
• Use optional End Coating
on exposed Top Rail
ends.
• All fastener locations
must be pre-drilled with
a 3/16” drill bit, or
mushrooming or
splitting may occur.
• Finish railing system by
applying an Evolutions
Contemporary Top Rail
to the top of the rail
assembly.
Installing Evolutions Rail™ Contemporary Stairs
with CableRail by Feeney
®