Page 14
10
9
INSTALL BOTTOM
UNIVERSAL RAIL
Pre-Drill 3/16”
#10 x 1”
Stainless Screws
Pre-Drill
3/16”
• Mark where Top
Universal Board meets
Bottom Post Sleeve.
• Remove Post Sleeve
and trim to stair angle.
Replace Post Sleeve.
• Use Post Sleeve to mark
the angle of cut on Post.
Remove Post Sleeve.
• Using a straight edge,
draw a line roughly 1/8”
below previous mark on
Post.
• Trim Post at lower line.
• Replace Post Sleeve.
• Slide on Post Skirts.
MEASURE AND TRIM
BOTTOM POST AND
BOTTOM POST SLEEVE
Pre-Drill 9/64”
#10 x 2” Coated Screws
• Use an extra Intermediate
Baluster, rested at the
bottom Universal Rail,
as a template for the
CableRail hardware and
through holes.
• Use a 3/16” drill bit to
transfer your marks onto
the Post Sleeve.
• Attach Intermediate
Baluster to the underside
of the top Universal Rail
with the 2 #10x1” screws.
• Attach the Bottom
Universal Rail to the Posts
Installing Evolutions Rail™ Contemporary Stairs
with CableRail by Feeney
®