31
●
Connecting a flame simulator
Handling Precautions
• Do the operation check in one sitting, and afterwards remove all test
wiring at once.
• Do not touch terminals (F) and (G) during the operation check. Doing so
might cause electric shock.
• FSP300C
(1) Wire terminals (F) to (F) and (G) to (G) as shown below.
(2) Turn the FLAME MODE switch of the
FSP300C
on.
• 123514A
Connect terminal 5 to the terminal F probe and terminal 6 to the terminal G plug.
Chapter 4. MAINTENANCE AND INSPECTION
F
S2
S1
ON
ON
OFF
G
FSP300C100
Terminal 5 (F)
Terminal 6 (G)
Flame mode
switch ON
FSP300C
FRS100C
POWER
FLAME
START
LEVEL
POWER
FLAME
START
LEVEL
G terminal wire
F terminal wire
FRS100B
Terminal G
plug
Terminal F
prove
Terminal 6
Terminal 5
123514A