
7
Chapter 2. Installation, Wiring
When the sub-base (Model BC-R05A100) is used
z
Installation orientation
Attach the device in the orientation shown below.
Do not install it in the orientations illustrated below.
z
DIN rail mounting
(1) Pull down the sub-base's DIN rail clamp.
(2) Attach to the DIN rail while checking above and below the sub-base.
(3) Push up the DIN rail clamp to attach the sub-base to the DIN rail.
z
Mounting in a panel
(1) Drill two M4 screw holes into the panel.
(Unit: mm)
(2) Use screws to mount the sub-base on the panel.
(Maximum tightening torque: 1.2 N
∙
m)
Display area
AUR890
main unit
AUR890
main unit
Correct
Correct
AUR890
main unit
Incorrect
Pull the DIN rail clamp
downwards
Push the DIN rail clamp
upwards to fix in place
Attach sub-base to DIN rail
62.5
M4
(2 locations)
Содержание 81447514-001
Страница 58: ...50...