40
Step 3: Remove two screws as below chart to take out cover of parallel communication.
Step 4: Install new parallel board with 2 screws tightly.
Step 6: Connect 2-pin to original position.
Step 7: Put communication board back to the unit.
Step 8: Put wire cover back to the unit. Now the inverter is providing parallel operation function.