Axon Body 3 Dock
Installation Manual
Axon Enterprise, Inc.
Page 14 of 25
8.
Install the screws into the stud until there is 1/8” (3.2 mm) of space between the bottom
of the screw head and the wall.
This will allow the bracket to be placed onto the screws and settle in the keyhole (the
holes in the bracket are shaped like keyholes to make it easier to adjust the mount’s
position on the wall).
9.
Repeat steps 5–8 for the other side of the mount bracket.
10.
After the Wall Mount Bracket is positioned correctly, tighten all of the screws.
11.
Step 5: Attach the Wall Mount Bracket to the Wall (Drywall Mount)
Your Wall Mount Kit comes with hardware for mounting the bracket to a stud or mounting
directly into the drywall. If you are installing the bracket to a wall stud, go to
Wall Mount Bracket to the Wall (Stud mount)
Note:
Use the screw-in anchors and shorter screws for drywall installation.
1.
Find the location where you want to mount the Wall Mount Bracket.
2.
Locate the Wall Mount Bracket on the wall.
3.
Use a level to ensure the bracket is level before marking the holes.
Mark the center of the four keyholes on the wall.
4.
Remove the Wall Mount Bracket and screw in the drywall anchors in each location.
5.
Screw in each of the screws until there is 1/8” (3.2 mm) of space between the bottom of
the screw head and the wall.
6.
This will allow the bracket to be placed onto the screws and settle in the keyhole.
Step 6: Connect the Cables
1.
There is space provided on the horizontal shelf to secure the power supply for the dock.
2.
Position the power supply between the slots in the bracket and secure the power supply
to the bracket with the Velcro strap.
3.
Route the barrel connector around the edge guard and plug the barrel connector into
the power jack on the dock.