2016-01-11 | © AXING AG Schweiz | Subject to change in design and type; errors and misprints reserved
9
Installation in the base unit SKS 40-00:
The power supply unit SKZ 5-04 is not included in the scope of delivery of the base unit.
Mount the power supply unit according to the enclosed operating instructions of the power supply unit.
The power supply unit has a short and a long DC connecting cable on the output side.
Connect the short DC connecting cable to the first SKT 40/80 module and the long DC connecting cable to the
third SKT 40/80 module.
The other modules are connected to each other using the enclosed DC connecting cable SKZ 40-00.
A separate DC connecting cable SKZ 40-01 is additionally required to supply the output combiner. Connect the
output combiner to the last module. The connecting cable SKZ 40-01 is not included in the scope of delivery.
Notes
Î
Observe the operator's manual of the corresponding headend base unit!
Î
Observe the operator's manual for the corresponding power supply unit!
Î
Before inserting or changing a module, pull the mains plug of the headend base unit from the socket!
Î
The antenna system must be installed and grounded according to the DIN EN 60728-11 standard.
Î
Install the base plate of the base unit in compliance with the safety regulations defined by the EN 60728-
11 standard. Connect the base plate of the base unit with an equipotential bonding cable (copper,
minimum 4 mm²).