
The DUT is then placed on its side in the area immediately in front of the two fixed
probe points, as shown in the photo above. Then slowly release the chrome knob,
allowing the spring-loaded PCB to push the DUT into position against the two probe
points, as shown below. The PCB silk-screening shows the proper device positioning.
50
Содержание AVR-EB4-B
Страница 45: ...The next photo shows a MELF device installed between the two pins 45 A MELF packaged Device Under Test DUT...
Страница 57: ...Then open the tan colored DUT socket by flipping forward the two black latches on the front edge of it 57...
Страница 69: ...PCB 158R5 LOW VOLTAGE POWER SUPPLY...
Страница 71: ...PCB 104G KEYPAD DISPLAY BOARD...
Страница 76: ...TEST JIG WIRING AVX TRR HPOST...
Страница 83: ...PERFORMANCE CHECK SHEET 83...