Avaya XBU48 Скачать руководство пользователя страница 7

Avaya

t

XBU48 Site Preparation, Installation and Operator’s Manual

S

700071244 Issue 3

3

Chapter 2

Installation

The following sections describe the installation and physical setup of
the 48 Vdc Extended Battery Cabinet.

Safety Warnings

This manual contains important instructions for your Avaya XBU48 that
should be followed during installation and maintenance of the UPS and
batteries.

DO NOT use any other sizes or types of batteries with the XBU48.

Read all of the caution and warning statements in “Safety Warnings” of
your Avaya UPS operator’s manual before performing the installation.

IMPORTANT SAFETY INSTRUCTIONS

SAVE THESE INSTRUCTIONS

This manual contains important instructions that you should follow during installation and
maintenance of the UPS and batteries. Please read all instructions before operating the
equipment and save this manual for future reference.

D A N G E R

Risk of electrical shock. Installation of battery cabinets must be done by trained service
personnel.

C A U T I O N

S

To reduce the risk of fire, connect only to a circuit provided with 15A maximum branch
circuit overload protection in accordance with the National Electrical Code,
ANSI/NFPA 70.

S

Never dispose of batteries in a fire. Batteries may explode when exposed to flames. In
the event of a fire involving the UPS and its batteries, use only carbon dioxide fire
extinguishers or those approved for use in electrical fire fighting.

S

Servicing of batteries should be performed or supervised by personnel knowledgeable of
batteries and the required precautions. Keep unauthorized personnel away from
batteries.

S

Never open or mutilate batteries. Released electrolyte is harmful to the skin and eyes,
and may be extremely toxic.

Содержание XBU48

Страница 1: ...Site Preparation Installation and Operator s Manual for 48 Vdc Extended Battery Cabinet XBU48 for use with Series 1 1500 2000 VA Uninterruptible Power Systems www powerware com avaya...

Страница 2: ...e at his own expense ICES 003 This Class A Interference Causing Equipment meets all requirements of the Canadian Interference Causing Equipment Regulations ICES 003 Cet appareil num rique de la classe...

Страница 3: ...Contents 1 Introduction 1 UPS Model and Battery Configurations 1 XBU48 System Recharge Time 1 XBU48 Battery Times 2 2 Installation 3 Safety Warnings 3 Installing the XBU48 5 Important Safeguards 10 XB...

Страница 4: ...TABLE OF CONTENTS Avayat XBU48 Site Preparation Installation and Operator s Manual S 700071244 Issue 3 ii...

Страница 5: ...model and battery configuration for your equipment 1 Load requirements of the equipment you want to protect Select the UPS model that meets the power consumption requirements of the equipment you want...

Страница 6: ...VA 1400 VA 1200 VA 1000 VA 800 VA 650 VA 3 5 1 1 1 1 1 1 1 1 1 4 0 2 1 1 1 1 1 1 1 1 4 5 2 2 1 1 1 1 1 1 1 5 0 2 2 2 1 1 1 1 1 1 5 5 2 2 2 2 1 1 1 1 1 6 0 2 2 2 2 2 1 1 1 1 6 5 2 2 2 2 2 1 1 1 1 7 0 2...

Страница 7: ...he UPS and batteries Please read all instructions before operating the equipment and save this manual for future reference DANGER Risk of electrical shock Installation of battery cabinets must be done...

Страница 8: ...hock or burn from high short circuit current The following precautions should be observed 1 Remove watches rings or other metal objects 2 Use tools with insulated handles 3 Do not lay tools or metal p...

Страница 9: ...l the XBU48 1 Place the XBU48 near the operating site The UPS should be well ventilated and away from direct sunlight or other heat source NOTE It is recommended to allow a minimum of 4 5 of space fro...

Страница 10: ...Refer to your local building codes for seismic mounting requirements 13 50 Minimum from Wall 8 50 7 50 TYP 0 44 1 563 13 00 13 00 0 375 Mounting Holes 7 60 from Front of Units Front of Unit Figure 2...

Страница 11: ...8 Align the L shaped mounting bracket with the two holes closest to the rear of the XBU48 and secure using two of the countersink screws from the start up kit NOTE The vertical section of the L bracke...

Страница 12: ...first cabinet Follow this procedure for each additional XBU48 13 Plug the detachable power cord into the charger AC input receptacle 14 Plug the other end of the power supply cord into a grounded thr...

Страница 13: ...and Operator s Manual S 700071244 Issue 3 9 Battery Circuit Breaker Battery Connector Battery Output Cord Unit Rating Label Charger Charger Air Exhaust Charger AC Input Receptacle Breaker Tie Alarm Co...

Страница 14: ...witch the circuit breaker to the ON position on each XBU48 18 The UPS may now be turned on according to your Avaya UPS operator s manual Important Safeguards S Do not connect or disconnect XBU48s whil...

Страница 15: ...vided on the rear panel of the XBU48 The contacts will close if there is an overload or overtemperature condition Optional To use the alarm contacts connect alarm leads to the two contacts on the alar...

Страница 16: ...lected IEC 320 C13 input connector Circuit Protection Circuit breaker protection Alarm Contact 1A 30 Vac or 1A 60 Vdc Dimensions WxDxH 17 2 x 24 6 x 28 3 43 7 x 62 5 x 71 9 cm Weight Shipping weight 7...

Страница 17: ...24 hours then retest Protected equipment power requirements exceed UPS capacity Reduce load then retest Charger LED is not on XBU48 connections are not secure Verify that the XBU48 is plugged in and t...

Страница 18: ...rmal operations If you have any questions or problems with your UPS call your Avaya service representative or the appropriate telephone number on the service label of your UPS Please have the followin...

Страница 19: ......

Страница 20: ...164201322C 164201322 C...

Отзывы: