
INSTALLATION
Avaya
t
XBU48 Site Preparation, Installation and Operator’s Manual
S
700071244 Issue 3
6
3.
A seismic installation of the XBU48 requires that the mounting
plates be bolted to the floor. See Figure 2 for a detailed drill and
mounting pattern.
NOTE
For Zone 4, it is recommended to use 5/16” self-drill bolts and hardware with
1 5/16” minimum embedment for 3000PSI-strength concrete. Refer to your local building
codes for seismic mounting requirements.
13.50”
Minimum
from Wall
8.50”
7.50” TYP
0.44”
1.563”
13.00”
13.00”
Ø0.375” Mounting Holes
7.60”
from Front
of Units
Front of Unit
Figure 2. Seismic Installation Mounting Pattern
4.
Using customer-supplied bolts, attach the mounting plates to the
floor.
NOTE
The floor mounting bolts are customer-supplied and should fit the 0.375” diameter
mounting holes on the mounting plates.
5.
Using the 5/16
”
bolts removed when unloading the cabinet from its
pallet, resecure the XBU48 to the mounting plate.
6.
Verify that the UPS is turned off.
Содержание XBU48
Страница 19: ......
Страница 20: ...164201322C 164201322 C...