Avaya XBU48 Скачать руководство пользователя страница 2

Class A EMC Statements

FCC Part 15

NOTE

This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15

of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the
equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency
energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio
communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the
user will be required to correct the interference at his own expense.

ICES-003

This Class A Interference Causing Equipment meets all requirements of the Canadian Interference Causing Equipment
Regulations ICES-003.

Cet appareil numérique de la classe A respecte toutes les exigences du Reglement sur le matériel brouilleur du Canada.

EN 50091-2

Some configurations are classified under EN 50091-2 as “Class-A UPS for Unrestricted Sales Distribution.” For these
configurations, the following applies:

WARNING

This is a Class A-UPS Product. In a domestic environment, this product may cause radio interference, in which

case, the user may be required to take additional measures.

Avaya and the Avaya logo are trademarks of Avaya Inc. and may be registered in certain jurisdictions.

E

Copyright 2001–2006 Avaya Inc. All rights reserved. No part of this document may be reproduced in any way

without the express written approval of Avaya Inc.

Содержание XBU48

Страница 1: ...Site Preparation Installation and Operator s Manual for 48 Vdc Extended Battery Cabinet XBU48 for use with Series 1 1500 2000 VA Uninterruptible Power Systems www powerware com avaya...

Страница 2: ...e at his own expense ICES 003 This Class A Interference Causing Equipment meets all requirements of the Canadian Interference Causing Equipment Regulations ICES 003 Cet appareil num rique de la classe...

Страница 3: ...Contents 1 Introduction 1 UPS Model and Battery Configurations 1 XBU48 System Recharge Time 1 XBU48 Battery Times 2 2 Installation 3 Safety Warnings 3 Installing the XBU48 5 Important Safeguards 10 XB...

Страница 4: ...TABLE OF CONTENTS Avayat XBU48 Site Preparation Installation and Operator s Manual S 700071244 Issue 3 ii...

Страница 5: ...model and battery configuration for your equipment 1 Load requirements of the equipment you want to protect Select the UPS model that meets the power consumption requirements of the equipment you want...

Страница 6: ...VA 1400 VA 1200 VA 1000 VA 800 VA 650 VA 3 5 1 1 1 1 1 1 1 1 1 4 0 2 1 1 1 1 1 1 1 1 4 5 2 2 1 1 1 1 1 1 1 5 0 2 2 2 1 1 1 1 1 1 5 5 2 2 2 2 1 1 1 1 1 6 0 2 2 2 2 2 1 1 1 1 6 5 2 2 2 2 2 1 1 1 1 7 0 2...

Страница 7: ...he UPS and batteries Please read all instructions before operating the equipment and save this manual for future reference DANGER Risk of electrical shock Installation of battery cabinets must be done...

Страница 8: ...hock or burn from high short circuit current The following precautions should be observed 1 Remove watches rings or other metal objects 2 Use tools with insulated handles 3 Do not lay tools or metal p...

Страница 9: ...l the XBU48 1 Place the XBU48 near the operating site The UPS should be well ventilated and away from direct sunlight or other heat source NOTE It is recommended to allow a minimum of 4 5 of space fro...

Страница 10: ...Refer to your local building codes for seismic mounting requirements 13 50 Minimum from Wall 8 50 7 50 TYP 0 44 1 563 13 00 13 00 0 375 Mounting Holes 7 60 from Front of Units Front of Unit Figure 2...

Страница 11: ...8 Align the L shaped mounting bracket with the two holes closest to the rear of the XBU48 and secure using two of the countersink screws from the start up kit NOTE The vertical section of the L bracke...

Страница 12: ...first cabinet Follow this procedure for each additional XBU48 13 Plug the detachable power cord into the charger AC input receptacle 14 Plug the other end of the power supply cord into a grounded thr...

Страница 13: ...and Operator s Manual S 700071244 Issue 3 9 Battery Circuit Breaker Battery Connector Battery Output Cord Unit Rating Label Charger Charger Air Exhaust Charger AC Input Receptacle Breaker Tie Alarm Co...

Страница 14: ...witch the circuit breaker to the ON position on each XBU48 18 The UPS may now be turned on according to your Avaya UPS operator s manual Important Safeguards S Do not connect or disconnect XBU48s whil...

Страница 15: ...vided on the rear panel of the XBU48 The contacts will close if there is an overload or overtemperature condition Optional To use the alarm contacts connect alarm leads to the two contacts on the alar...

Страница 16: ...lected IEC 320 C13 input connector Circuit Protection Circuit breaker protection Alarm Contact 1A 30 Vac or 1A 60 Vdc Dimensions WxDxH 17 2 x 24 6 x 28 3 43 7 x 62 5 x 71 9 cm Weight Shipping weight 7...

Страница 17: ...24 hours then retest Protected equipment power requirements exceed UPS capacity Reduce load then retest Charger LED is not on XBU48 connections are not secure Verify that the XBU48 is plugged in and t...

Страница 18: ...rmal operations If you have any questions or problems with your UPS call your Avaya service representative or the appropriate telephone number on the service label of your UPS Please have the followin...

Страница 19: ......

Страница 20: ...164201322C 164201322 C...

Отзывы: