
5.3.3. Example of meter set at 200/5 amp
Example of how the display should look for a meter programmed to 200/5 amp.
See table for more settings.
5.4 P.T. (Voltage Supply)
The meter has been designed to work in 3 phase 4 wire or a 3 phase 3 wire
network and this requires a primary and secondary voltage ratio input.
The default is a 3 phase 4 wire configuration.
Long press to enter the PT2 routine.
For example:
A 3 phase 3 wire, 11000/110 Volt configuration:
Set the secondary (P.T.2) to 110 and the “RATE” (P.T.1 multiplier) to 100.
(110 X100 = 11,000)
5.4.1 P.T.2 (voltage supply)
Set secondary voltage input the meter
Range: 100V ~ 480V
Default: 230V ( L-N)
Long press for confirmation.
5.4.2 P.T.1 (Primary Voltage)
Set primary voltage input the meter
Range: 1V ~ 2000V
Default: 1
Then press to enter the PT1 routine.
Long press , the PT1 setting will flash.
Use or , to select PT1.
Long press for confirmation.
Press to return the PT set up menu.
C.T Primary
100/5
150/5
200/5
250/5
300/5
400/5
500/5
600/5
Number to program into
the meter
20
30
40
50
60
80
100
120
C.T Primary
800/5
1000/5
1200/5
1500/5
1600/5
2000/5
2500/5
3000/5
Number to program into
the meter
160
200
240
300
320
400
500
600
Ph S
ESC
P
P
E
E
E
E
E
www.autometers.co.uk
11
V/A