18
If the voltage drop is
high , the user will be
instructed to repair the
cable on the first pass.
On the 2nd or later
tries the user is
given the option to
Accept “As Is” the
VDrop to continue
the test.
After the repair is
made the user will
need to repeat the
Voltage Drop Test.
POWERNET (STARTER CABLE VOLTAGE DROP TEST)