background image

5

Installation instruction
RWA - Control Unit EMB 7300

!

W

ARning

Area of application

The control device must be used only for its intended pur- 
pose. For additional applications, consult the manufacturer 
or its authorised dealer.

Installation

These instructions are intended for expert and safety- 
conscious electricians and / or qualified personnel familiar 
with the electrical and mechanical installation of drives and 
control systems.

Mounting material

The required mounting material must be modified to fit the 
occurring load.

Routing cables and electrical connection 

Electrical lines and connections may be routed or instal-
led only by approved specialist contractors. Never operate 
drives, Control Units, operating elements and sensors at 
operating voltages and connections contrary to the speci- 
fications of the manufacturer.

s

AfEty

 

instRUCtions

It is important to follow these instruc-
tions for the safety of persons. These 
instructions must be kept in a safe place 
for the entire service life of the products.

The planning and calculation of the 
wiring system is the responsibility of 
the builder or its agent or the authori-
sed  builder and must be performed 
according to the statutory provisions.

n

otE

All relevant instructions must be observed for the in- 
stallation, specifically:
•  VDE 0100  Setting up high-voltage systems up to 1000 V
•  VDE 0815  Wiring cables
• Specimen Guideline on Conduits German designation 

 (MLAR).

The types of cable, cable lengths and cross-sections must 
be selected in accordance with the manufacturer’s technical 
data. If necessary, the cable types must be coordinated with 
the competent local authorities and energy supply com- 
panies. Low-voltage lines (24 V DC) must be routed 
separate from the high-voltage lines. Flexible cables may 
not be flush-mounted. Freely suspended cables must be 
equipped with strain reliefs.

The power line on-site must be secured se-
parately and provided all poles separators. 
After opening of the system housing voltage 
carrying parts are exposed. The system must 
be separated from the power supply and ac-
cumulator voltage before each intervention in 
the Control Unit of the system.

Clamping points must be checked for tightness of threa-
ded connections and cable ends. Access to junction boxes, 
clamping points and external drive control systems must be 
ensured for maintenance work. 

Commissioning, operation and maintenance

After the installation and after each modification in the 
set up all functions must be checked with a trial run. 
After the installation of the system is completed the 
end-user must be introduced to all important operating 
steps. If necessary, he must be advised of all remaining risks / 
dangers. 
The end-user must be instructed in intended use of the 
drives and, if necessary, the safety instructions. The end-user 
must be specifically instructed that no additional forces, 
except for the pressure and tension in the opening and 
closing direction of the casement, may be applied to the 
spindle, chain or lever of the drive. 

Cables must be laid such way that they cannot 
be sheared off, twisted or bent during operati-
on. It is recommended to perform an insulati-
on measurement of the system’s line network 
and to document this.

n

otE

Post warning signs!

Before working on the system, it must be com-
pletely disconnected from the power supply 
and emergency power supply (e.g. accumula-
tors) and secured against being switched on 
again accidentally. While working in the Control 
Unit the workplace must be secured to prevent 
unauthorised access. You must ensure that 
unauthorised personnel are unable to open 
the Control Unit.

!

W

ARning

Check all functions of the system before 
releasing it for operation.

The installation instructions of system components (smo-
ke detector, natural smoke and heat exhaust ventilators, 
drives, etc.) are part of the documentation for the complete 
system and must be kept accessible for authorised quali-
fied personnel, together with the installation and operating 
instructions, for the entire service life of the system.

Software terms and conditions

The Control Unit is configured by the factory for the inten-
ded use (standard configuration). The software, especially 
developed for this Control Unit, allows a quick and easy 
adjustment of the factory setting to the respective re- 
quirements. Furthermore, the system status can be saved, 
retrieved and printed.

s

afety

 i

nstruCtions

01

Содержание EMB 7300

Страница 1: ...g to EN12101 10 and control panel according to prEN12101 9 RWA Control Unit EMB 7300 2 5 A 5 A 10 A 20 A tested electrical control device EMB 7300 with recognition number G 514001 Installation and Commissioning Instructions ...

Страница 2: ...Maximal detector in drive line Installation step 3 Connection of automatic and manual smoke detectors Installation step 4 Connecting wind and rain sensors Installation step 5 Installing relay plug in card REL and BUS connection Installation step 6 Connecting power supply Installation step 7 System configuration using software EMB Kompakt Installation step 8 Enabling operation completing installati...

Страница 3: ... V Volts PU Packaging Units Vpp Residual ripple Voltage Peak Peak W Watts Ω k Ω Ohm Kilohms Figures AC Alternating current 50Hz 60Hz DC Direct current I Electric current L Length ME Module space unit 1 ME 23 mm NC Contact closed normally closed NO Contact opened normally opened P Electric power R Electrical resistance U Electric voltage Um Change over switch Colour abbreviation according to IEC 60...

Страница 4: ... lives and protect property Furthermore the electric window ensures fresh air supplied for natural ventilation of the building Intended use according to the Declaration of Con formity The control device is intended for stationary installation and electrical connection as part of a building In accordance with the attached Declaration of Con formity the control device in combination with electromoti...

Страница 5: ...e each intervention in the Control Unit of the system Clamping points must be checked for tightness of threa ded connections and cable ends Access to junction boxes clamping points and external drive control systems must be ensured for maintenance work Commissioning operation and maintenance After the installation and after each modification in the set up all functions must be checked with a trial...

Страница 6: ...issue of a Declaration of Conformity according to European guidelines The prerequisites of the system see chapter Systems confi guration of software must be checked prior to installation The Software clause for handing over the standard soft ware as part of shipments of the ZVEI German Electrical and Electronic Manufacturer s Association is accepted as legally binding upon installation See our hom...

Страница 7: ...ance free back up accumulators 2x 12 V 2 3 Ah Part No 541000 Application Compact Control Unit for smoke and heat exhaust ventilation systems operating with 24V DC voltage suitable for staircases TECHNICAL DATA Rated values Operating voltage 230V AC 195 253 V AC 50 60 Hz Max power consumption 460 W Output voltage 24V DC 20 28 V DC 0 5 Vpp Output current 5 0 A Ambient temperature range 5 C 40 C Prot...

Страница 8: ...ting steel sheet RAL 7035 light grey Dimensions WxHxD 400 x 300 x 150 mm Connection terminals 1 5 mm Drives 6 mm rigid wire Motherboard 1 RWA group 2 Vent groups Application Compact Control Unit for smoke and heat exhaust ventilation systems operating with 24V DC voltage suitable for staircases TECHNICAL DATA Rated values Operating voltage 230V AC 195 253 V AC 50 60 Hz Max power consumption 805 W ...

Страница 9: ...5 x 285 x 122 mm Version 2 5A 5A 400 x 300 x 150 mm Version 10A 400 x 400 x 200 mm Version 20A Preparing assembly Technical Data Warning Important instructions for safe assembly Fully observe all instructions incorrect assembly may lead to serious injuries Before starting the installation please check with the delivery note that the delivery is complete and correct any complaints received later ca...

Страница 10: ... exhausting natural ventilation Input for ventilation line 1 max 10 vent buttons Output for drive line 2 only for EMB 7300 5 A 0102 10 A 0102 20 A 0102 Input for ventilation line 2 max 10 vent buttons only for MB 7300 5 A 0102 10 A 0102 20 A 0102 Housing of Control Unit with or without integrated break glass unit and ventilation button Connections for wind and rain sensor disabled in case of alarm...

Страница 11: ...ine length and cross section A drives depend on the type of drive and on the number of drives Line length and cross section can be determined according to the following formula Formula to calculate the required wire cross section of a infeed line A cross section of line in mm2 L line length in m I current of connected drives in A U line voltage drop 2 V DC total length infeed line voltage drop Bef...

Страница 12: ... 5 A nominal current EMB 7300 10 A max 10 A nominal current EMB 7300 20 A 2x max 10 A nominal current RWA release in case of fire overrides ventilation No ventilation in the event of a mains power supply failure accumulator operation RWA release in case of fire overrides ventilation No ventilation in the event of a mains power supply failure accumulator operation Automatic ventilation control e g ...

Страница 13: ...ance with applicab le legal requirements The terminal cross section for the drive connection is EMB 7300 0101 max 2 5 mm flexible EMB 7300 0101 T max 4 0 mm rigid wire EMB 7300 0101 max 4 0 mm flexible EMB 7300 0101 T or EMB 7300 0102 max 6 0 mm rigid wire EMB 7300 0101 EMB 7300 0102 EMB 7300 0102 2 5A 2 5A 5A 5A 5A 10A 10A 20A Formula to calculate the required wire cross section of a infeed line ...

Страница 14: ...nection of automatic and manual smoke detectors 04 OK 11 10 9 8 7 6 5 4 3 2 1 1 1 1 22 5 71 1 13 14 15 16 17 18 19 A S B 1 72 OK 11 10 9 8 7 6 5 4 3 2 1 10 k IN C O M O UT IN C O M O UT IN C O M OU T BMA 1 2 3 4 5 1 22 1 22 COM OUT IN IN IN OUT OUT COM COM RE 1 13 14 15 16 18 19 1 2 3 4 5 6 7 8 9 10 11 2 5 A 5 A 20 A 10 A Automatic smoke detector Breakglass unit Buttons Indicators COM Indicators m...

Страница 15: ... rain sensors is deactivated Before mounting and positioning the wind rain sen sors carefully read the safety and assembly instructions provided with the products They are part of the system documentation and must be adhered to and kept accor dingly e g for servicing purposes Installation step 4 Connecting wind and rain sensors 2 5 A 5 A 20 A 10 A Installation step 4 Connecting Wind and Rain Senso...

Страница 16: ... installation an connect when disconnected from the mains power supply Switch off power supply and secure against reconnection The motherboard has two slots for using one relay plug in card REL 65 each order no 650200 so that external processing of messages via floating relay contact 1 x change over switch 42 V max 0 5 A is possible Cable installation must be in compliance with applicable legalreq...

Страница 17: ... AC 50 60 Hz On the version with front mounted push button the connector may be removed Routing via external fuse and switching component PE BU BU BU 2 x back up accumulator 2 3 Ah 12V Ensure correct polarity when connecting red blue Attachment of the accumulators with the optional accumulator holder set Part No 683250 only for compact housing The accumulator set may also be fastened to the housin...

Страница 18: ... A N N 1 72 N L V VGG N L USB Do not remove cover F1 F2 F3 Switching power supply 5A RD RD RD RD RD L L Cover SMOKE VENT N N 225 mm 400 mm 285 mm 300 mm 10 A oder 400 mm 20 A Wiring duct 230V AC 50 60 Hz 230V AC 50 60 Hz Version 0102 only Routing via external fuse and switching component Routing via external fuse and switching component PE PE BU BU BU BU Output DC 24V Switching power supply 10 A o...

Страница 19: ...free version of the system software version VIEW can be downloaded from the homepage www aumueller gmbh de The software can be installed on a computer notebook or net book Please pay regard to the hardware and system requirements see below Follow the instructionsdisplayed on the screen to install the program The software offers many features to adapt the system to your requirements However you sho...

Страница 20: ...s RWA systems require a logbook in which all important master data have to be entered prior to operation enable and all operational events during the period in operation The logbook is part of the system documents and must be stored and available to authorized staff at all times We advise to perform an insulation measurement of the cable network before enabling operation of the plant and to keep a...

Страница 21: ...ght open circuit or short circuit in manual fire alarm faulty power monitoring Indicator S blinks slowly open circuit or short circuit in smoke detector line faulty power monitoring Indicator S blinks 2 times service required indicator B green lights up Indicator S blinks 3 times fault bus module e g radio module Indicator S blinks 4 times open circuit or short circuit in drive line 1 faulty power...

Страница 22: ... 1 7 2 USB 1 REL65 2 REL65 BUS Module BUS Wind Rain RM HSE LT 2 F1 A A N N Drive 1 Stecker für Front Button Drive 2 A Z Reset LT 1 Indicators GN Operation YE Fault RD Alarm EMERGENCY OPEN Drive run direction and position A OPEN RD Z CLOSE GN Drive run direction A OPEN RD Z CLOSE GN Duo LED 2 x on version 0102 The Duo LED displays the current switched direction of the line vol tage for the duration...

Страница 23: ... contract with a specialist company authorized by the manufacturer A sample maintenance contract can be downloaded from the homepage of Firm Aumüller Aumatic GmbH www aumueller gmbh de After opening of the system housing voltage carrying parts are exposed Each time before performing main tenance work or making a modification of the structure e g replacement of the window drive the mains voltage an...

Страница 24: ...wing Improper use of the product Improper installation commissioning operation maintenance or repair of the product Operating the product by defect and improper installed or not functioning safety and protection devices Ignoring instructions and installation requirements in these in structions Unauthorized constructional modifications at the product or accessories Disaster situations due to effect...

Страница 25: ...25 Installation instruction RWA Control Unit EMB 7300 08 ...

Страница 26: ... different Control Unit versions Remark Terminals Drive 1 Drive 2 only version 0102 CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE ZU Operation Fault COM COM OPEN OPEN OPEN OPEN OPEN OPEN Buttons Buttons Buttons Indicators Indicators Indicators EMERGENCY EMERGENCY OPEN OPEN COM Line monitoring Line monitoring COM COM COM COM COM only version 0102 optional optional Ventilation 1 Ventilation 2 1 REL 65 2 REL 6...

Страница 27: ...rvices The publication of these assembly and commissioning instructions supersedes all previous editions The VdS approval includes the following Control Units EMB 7300 without RWA button EMB 7300 with orange RWA button EMB 7300 without RWA button EMB 7300 with orange RWA button EMB 7300 EMB 7300 2 5A 2 5A 5A 5A 10A 20A Certificate and Declaration of Conformity We declare under our sole responsibil...

Страница 28: ...en Tel 49 8271 8185 0 Fax 49 8271 8185 250 info aumueller gmbh de 9000017000_V0 1_KW05 14 www aumueller gmbh de AUMÜLLER AUMATIC GMBH Gemeindewald 11 86672 Thierhaupten Tel 49 8271 8185 0 Fax 49 8271 8185 250 info aumueller gmbh de 9000007401_V2 4_KW46 20 ...

Отзывы: